flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

American Concrete Institute releases Spanish edition of structural concrete code

American Concrete Institute releases Spanish edition of structural concrete code

Measure would exempt space from emergency stairwells in counting towards measured floor area in zoning


January 14, 2015

The American Concrete Institute (ACI) has released the Spanish edition of ACI 318-14: Building Code Requirements for Structural Concrete.

 

The 2015 International Building Code references 318-14. A Spanish language inch-pound version has also been released. The reorganized 318-14 is structured from an engineer’s perspective.

 

By focusing on member design, ACI 318 requirements flow more intuitively and have fewer cross-references, ACI says. The document has greater ease of use; improved logic and flow of information; member-based organization to quickly locate relevant code information; and construction requirements centralized in one chapter.

 

Publication of ACI 318-14 is the first major reorganization of ACI 318 since 1971 and represents nearly a decade of work. Updates include new chapters on structural systems and diaphragms, and a consistent structure for each member chapter. The U.S. and more than 22 countries around the world base their national building codes on all or part of ACI 318, and the document is used globally.

 

(http://www.concrete.org/News/NewsDetail.aspx?f=51687651)

 

New York City last year adopted the National Institute of Standards and Technology (NIST) recommendation to require additional exit stairways in high-rise buildings.

Since stairwells count as part of a building’s floor, an amendment to the city’s Zoning Resolution is also required and city government is considering the measure. The amendment exempts space used for the additional emergency stairwells from counting toward zoning floor area in new, non-residential buildings 420 feet high or taller.

The International Building Code (IBC) adopted the NIST’s findings in 2009, following a review of high-rise safety after the terrorist attacks of Sept. 11, 2001. A major recommendation was to increase exit capacity of buildings with additional exit pathways.

The zoning measure applies primarily to office buildings and hotels in Midtown and Lower Manhattan, Downtown Brooklyn, and Long Island City, Queens. The 11 community boards in those neighborhoods and borough presidents in Manhattan, Brooklyn, and Queens have 60 days to review the amendment, followed by reviews at the City Planning Commission and the City Council.

(http://www.qgazette.com/news/2015-01-07/Features/Making_Tall_Buildings_Safer.html)

Related Stories

Codes and Standards | Aug 26, 2021

California may require solar on new high-rise residential and commercial buildings

State energy commission approves proposal; Could become law in 2023.

Codes and Standards | Aug 25, 2021

Study finds racism, discrimination common in construction industry

NIBS to share best practices with industry leaders to improve worker treatment.

Codes and Standards | Aug 24, 2021

White paper addresses insulated metal panel specifications for roofs and walls

Pertains to provisions of the National Building Code of Canada.

Codes and Standards | Aug 24, 2021

KTGY releases free resource to reduce carbon footprint in multifamily developments

Helps navigate Denver Green Code measures—a series of voluntary codes.

Codes and Standards | Aug 19, 2021

Massive infrastructure bill includes hundreds of millions for building energy efficiency

Funds allotted for updated code implementation, construction technology, K-12 efficiency programs.

Codes and Standards | Aug 18, 2021

Fannie Mae green bonds program could be greenwashing

Analysis shows significant number of green bond properties become less efficient.

Codes and Standards | Aug 17, 2021

Three Texas cities head list of most environmentally vulnerable

Hazard analysis includes natural disasters and government response categories.

Codes and Standards | Aug 16, 2021

Bill would reform New York’s public contracting process

Council on Public Contracting Reform to have contractor representation.

Codes and Standards | Aug 12, 2021

AGC pushes for more environmentally friendly construction

Contractor trade group supports government investment, tax incentives to reduce carbon footprints.

Codes and Standards | Aug 11, 2021

Decentralized approach to codes means emissions reduction responsibility falls on local officials

Efficiency advocates focusing more on local code amendments.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021