flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

American Concrete Institute releases Spanish edition of structural concrete code

American Concrete Institute releases Spanish edition of structural concrete code

Measure would exempt space from emergency stairwells in counting towards measured floor area in zoning


January 14, 2015

The American Concrete Institute (ACI) has released the Spanish edition of ACI 318-14: Building Code Requirements for Structural Concrete.

 

The 2015 International Building Code references 318-14. A Spanish language inch-pound version has also been released. The reorganized 318-14 is structured from an engineer’s perspective.

 

By focusing on member design, ACI 318 requirements flow more intuitively and have fewer cross-references, ACI says. The document has greater ease of use; improved logic and flow of information; member-based organization to quickly locate relevant code information; and construction requirements centralized in one chapter.

 

Publication of ACI 318-14 is the first major reorganization of ACI 318 since 1971 and represents nearly a decade of work. Updates include new chapters on structural systems and diaphragms, and a consistent structure for each member chapter. The U.S. and more than 22 countries around the world base their national building codes on all or part of ACI 318, and the document is used globally.

 

(http://www.concrete.org/News/NewsDetail.aspx?f=51687651)

 

New York City last year adopted the National Institute of Standards and Technology (NIST) recommendation to require additional exit stairways in high-rise buildings.

Since stairwells count as part of a building’s floor, an amendment to the city’s Zoning Resolution is also required and city government is considering the measure. The amendment exempts space used for the additional emergency stairwells from counting toward zoning floor area in new, non-residential buildings 420 feet high or taller.

The International Building Code (IBC) adopted the NIST’s findings in 2009, following a review of high-rise safety after the terrorist attacks of Sept. 11, 2001. A major recommendation was to increase exit capacity of buildings with additional exit pathways.

The zoning measure applies primarily to office buildings and hotels in Midtown and Lower Manhattan, Downtown Brooklyn, and Long Island City, Queens. The 11 community boards in those neighborhoods and borough presidents in Manhattan, Brooklyn, and Queens have 60 days to review the amendment, followed by reviews at the City Planning Commission and the City Council.

(http://www.qgazette.com/news/2015-01-07/Features/Making_Tall_Buildings_Safer.html)

Related Stories

| Oct 8, 2013

Report on large New York City buildings shows progress on energy efficiency

Buildings in New York City have been found to have a median score of 67 out of 100 in Energy Star's Portfolio Manager, an increase from 64 last year, and above the national average of 50, according to a study prepared by the Natural Resources Defense Council for the office of Mayor Michael Bloomberg.

| Oct 8, 2013

ConsensusDocs offers online prequalification management application to boost industry efficiency

In collaboration with ConsensusDocs, iSqFt has launched a new online platform designed to make the prequalification process for contractors and subcontractors seeking new work more efficient.

| Oct 8, 2013

Government shutdown closes E-Verify, could hamper construction hiring

E-Verify, the online federal program used to check the immigration status of prospective hires, has been closed due to the federal government shutdown.

| Oct 3, 2013

Florida contractors worry that regulations will hamper their ability to hire

Regulations such as the E-Verify rule and the Affordable Care Act could hinder contractors from hiring additional workers, according to some Florida contractors.

| Oct 3, 2013

Fall protection violations top OSHA citations list

Violations of fall-protection standards in fiscal 2013 are again the most frequent source of citations from the Occupational Safety and Health Administration, according to its top 10 list.

| Oct 3, 2013

Arizona utility pushes for change in building codes to boost efficiency on all commercial projects

Many large construction projects in Arizona are going green by paying attention to energy efficiency, but smaller buildings that are often rented out haven't yet jumped on the bandwagon.

| Oct 3, 2013

Bipartisan energy efficiency bill stalled; may not be revived this year

The Senate spent the first two weeks of September trying to pass bipartisan energy efficiency legislation, commonly known as Shaheen-Portman (S. 1392) that would have impacted building codes.

| Oct 3, 2013

LEED credential exams will feature LEED v4 material beginning next spring

The LEED Professional Credential exams for the LEED Green Associate and LEED AP with specialty designations will feature LEED v4 material beginning in late spring 2014.

| Sep 26, 2013

Ballot period on National CAD Standards open until Oct. 13

The Ballot Comment Period to update the nation’s leading computer-aided design (CAD) standard is now open.

| Sep 26, 2013

OSHA encourages comments on respirable crystalline silica rules

The Occupational Safety and Health Administration’s proposed rulemaking for respirable crystalline silica has been published in the Federal Register.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021