flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ambitious state EV adoption goals put pressure on multifamily owners to provide chargers

Codes and Standards

Ambitious state EV adoption goals put pressure on multifamily owners to provide chargers

Options are complex with no silver bullet solution.


By Peter Fabris, Contributing Editor | October 17, 2022
Multifamily EV Charging Stations
Courtesy Pexels.

California’s recently announced ban on the sale of new gas-powered vehicles starting in 2035—and New York’s recent decision to follow suit—are putting pressure on multifamily property owners to install charging stations for tenants.

Owners have numerous business models and potential partners that offer multiple types of incentives, making the formation of a strategy a complex undertaking. They must consider the costs for chargers and the potential need to install additional electrical capacity costing up to six figures per apartment building.

One option is to outsource chargers to third-party vendors, but vendors may be cool to the idea because of the current lack of a critical mass of users. Even if this option is available to them, owners could still be on the hook for installing electric infrastructure to support charging stations.

Some programs have been created to address that need. Southern California Edison, for example, earmarked $436 million to install 35,000 charge ports. The program focused on disadvantaged communities with 30% of funds dedicated for multifamily homes.

While that program has proven to be popular, attracting twice as many applicants as it can serve, the utility expects to run out of these funds by the end of the year. It’s important that landlords find solutions to the charger challenge soon, with demand from renters predicted to grow significantly in coming years as declining sticker prices of some EV models make them more attractive to a wider swath of the population.

Related Stories

Codes and Standards | Jul 12, 2018

Developer says net zero Salt Lake City apartment high-rise built at standard cost

Off-site solar, and mechanical/electrical system savings aid the achievement.

Codes and Standards | Jul 11, 2018

D.C. local worker requirement not being met

Government doing little to verify self-reported project data.

Codes and Standards | Jul 10, 2018

Carbon emissions in cement production threaten GHG reduction goals

Cement is essential to many infrastructure projects that address climate change.

Codes and Standards | Jul 10, 2018

DOE’s Better Buildings Summit to be held in Cleveland, August 21-23

Agenda includes technical training and networking opportunities.

Codes and Standards | Jul 6, 2018

Delos and HDR will co-develop wellness design tools and collaborate on research

WELL Building Standard pioneer teams with architects to advance wellness innovations in the built environment.

Codes and Standards | Jul 5, 2018

BREEAM New Construction standard launched in U.S.

Follows successful launch of BREEAM In-Use standard.

Codes and Standards | Jun 29, 2018

Nearly half of nonresidential construction projects now delivered by design-build

‘Alternative’ method now mainstream for nonresidential, highway/street, and water/wastewater construction projects.

Codes and Standards | Jun 28, 2018

Modular construction may be key to relieving housing crunch

May be only way to meet needs as ranks of construction workers decline.

Codes and Standards | Jun 27, 2018

Thirty nine San Francisco high rises at risk of collapse in major earthquake

Vulnerable buildings have welded columns and beams.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021