flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Amazon’s second headquarters completes its first buildings: a pair of 22-story towers

Office Buildings

Amazon’s second headquarters completes its first buildings: a pair of 22-story towers

In Arlington, Va., the all-electric project helps further the company’s energy goals and provides a 2.5-acre public park.


By Novid Parsi, Contributing Editor | November 2, 2023
Photo: Magda Biernat Photography
Amazon funded the renovation and expansion of the adjacent Met Park—turning an underused green area into a public park. In addition to the central green, the 2.5-acre park features a children’s playground with a jungle gym, small and large dog parks, and a community garden. Art pieces have been placed along the park’s forest walk. Photo: Magda Biernat Photography

Amazon has completed construction of the first two buildings of its second headquarters, located in Arlington, Va. The all-electric structures, featuring low carbon concrete and mass timber, help further the company’s commitment to achieving net zero carbon emissions by 2040 and 100% renewable energy consumption by 2030. 

Designed by ZGF Architects, the two 22-story buildings—comprising 2.1 million sf of space and 50,000 sf of retail space—are on track to become the largest LEED v4 Platinum buildings in the U.S., according to a statement from ZGF.

By using low-carbon concrete mixes and CarbonCure technology, the project achieved a 20% reduction in the concrete structures’ carbon footprint, compared to the industry baseline. ZGF incentivized trades to experiment with mixes and reduce greenhouse gas emissions. The firm’s open-source LCA calculator enabled construction partners to assess proposed concrete mixes and measure their impact.

The buildings capture and reuse rainwater, shower water, and HVAC condensation—helping to achieve 50% water savings below building code and recycle 7.5 million gallons a year. And more than four-fifths of all construction waste materials—including concrete, drywall, metals, wood, cardboard, and plastic—were diverted from landfills. This prevented over 17,000 tons of material from entering landfills. 

Amazon funded the renovation and expansion of the adjacent Met Park—turning an underused green area into a public park. In addition to the central green, the 2.5-acre park features a children’s playground with a jungle gym, small and large dog parks, and a community garden. Art pieces have been placed along the park’s forest walk.

The buildings feature 19 rooftop terraces, eight of which can be occupied. On a farm terrace, Amazon employees can volunteer to grow herbs and vegetables that will be donated to community organizations. The two towers also have more than 3,000 operable windows.

On the Building Team:
Owner: Amazon
Developer: JBG Smith
Design architect and architect of record: ZGF Architects
MEP engineer: GHT Limited Consulting
Structural engineer: Thornton Tomasetti
Construction: Clark Construction

Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography

 

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

Robert Wilson joins SmithGroupJJR

Wilson makes the move to SmithGroupJJR from VOA Associates, Inc., where he served as a senior vice president and technical director in its Chicago office.

| May 31, 2012

5 military construction trends

Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 15, 2012

Don’t be insulated from green building

Examining the roles of insulation and manufacturing in sustainability’s growth.

| May 15, 2012

SAGE Electrochromics to become wholly owned subsidiary of Saint-Gobain

This deal will help SAGE expand into international markets, develop new products and complete construction of the company’s new, state-of-the-art manufacturing facility in Faribault, Minn.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021