Amazon has completed construction of the first two buildings of its second headquarters, located in Arlington, Va. The all-electric structures, featuring low carbon concrete and mass timber, help further the company’s commitment to achieving net zero carbon emissions by 2040 and 100% renewable energy consumption by 2030.
Designed by ZGF Architects, the two 22-story buildings—comprising 2.1 million sf of space and 50,000 sf of retail space—are on track to become the largest LEED v4 Platinum buildings in the U.S., according to a statement from ZGF.
By using low-carbon concrete mixes and CarbonCure technology, the project achieved a 20% reduction in the concrete structures’ carbon footprint, compared to the industry baseline. ZGF incentivized trades to experiment with mixes and reduce greenhouse gas emissions. The firm’s open-source LCA calculator enabled construction partners to assess proposed concrete mixes and measure their impact.
The buildings capture and reuse rainwater, shower water, and HVAC condensation—helping to achieve 50% water savings below building code and recycle 7.5 million gallons a year. And more than four-fifths of all construction waste materials—including concrete, drywall, metals, wood, cardboard, and plastic—were diverted from landfills. This prevented over 17,000 tons of material from entering landfills.
Amazon funded the renovation and expansion of the adjacent Met Park—turning an underused green area into a public park. In addition to the central green, the 2.5-acre park features a children’s playground with a jungle gym, small and large dog parks, and a community garden. Art pieces have been placed along the park’s forest walk.
The buildings feature 19 rooftop terraces, eight of which can be occupied. On a farm terrace, Amazon employees can volunteer to grow herbs and vegetables that will be donated to community organizations. The two towers also have more than 3,000 operable windows.
On the Building Team:
Owner: Amazon
Developer: JBG Smith
Design architect and architect of record: ZGF Architects
MEP engineer: GHT Limited Consulting
Structural engineer: Thornton Tomasetti
Construction: Clark Construction
Related Stories
Sponsored | | Sep 25, 2014
Architects transform warehouse into office space while preserving its historic nature
When it came time for CSHQA, an award-winning, full-service architecture and engineering firm, to move office locations, they didn’t need to look far. The 20,000-square-foot warehouse was not only a mere three blocks away, its renovation would be an ideal demonstration piece to show existing and potential clients.
| Sep 25, 2014
Look to history warily when gauging where the construction industry may be headed
Precedents and patterns may not tell you all that much about future spending or demand.
| Sep 24, 2014
Architecture billings see continued strength, led by institutional sector
On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.
| Sep 23, 2014
Cloud-shaped skyscraper complex wins Shenzhen Bay Super City design competition
Forget the cubist, clinical, glass and concrete jungle of today's financial districts. Shenzhen's new plan features a complex of cloud-shaped skyscrapers connected to one another with sloping bridges.
| Sep 23, 2014
Designing with Water: Report analyzes ways coastal cities can cope with flooding
The report contains 12 case studies of cities around the world that have applied advanced flood management techniques.
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 15, 2014
Ranked: Top international AEC firms [2014 Giants 300 Report]
Parsons Brinckerhoff, Gensler, and Jacobs top BD+C's rankings of U.S.-based design and construction firms with the most revenue from international projects, as reported in the 2014 Giants 300 Report.
| Sep 15, 2014
Argentina reveals plans for Latin America’s tallest structure
Argentine President Cristina Fernández de Kirchner announces the winning design by MRA+A Álvarez | Bernabó | Sabatini for the capital's new miexed use tower.
| Sep 12, 2014
Armstrong first in Pennsylvania to earn LEED Platinum recertification from USGBC
The Armstrong facility is the first building in Pennsylvania and among only 17 buildings globally to achieve recertification at the highest level possible under USGBC’s LEED-EBOM program.