Amazon has completed construction of the first two buildings of its second headquarters, located in Arlington, Va. The all-electric structures, featuring low carbon concrete and mass timber, help further the company’s commitment to achieving net zero carbon emissions by 2040 and 100% renewable energy consumption by 2030.
Designed by ZGF Architects, the two 22-story buildings—comprising 2.1 million sf of space and 50,000 sf of retail space—are on track to become the largest LEED v4 Platinum buildings in the U.S., according to a statement from ZGF.
By using low-carbon concrete mixes and CarbonCure technology, the project achieved a 20% reduction in the concrete structures’ carbon footprint, compared to the industry baseline. ZGF incentivized trades to experiment with mixes and reduce greenhouse gas emissions. The firm’s open-source LCA calculator enabled construction partners to assess proposed concrete mixes and measure their impact.
The buildings capture and reuse rainwater, shower water, and HVAC condensation—helping to achieve 50% water savings below building code and recycle 7.5 million gallons a year. And more than four-fifths of all construction waste materials—including concrete, drywall, metals, wood, cardboard, and plastic—were diverted from landfills. This prevented over 17,000 tons of material from entering landfills.
Amazon funded the renovation and expansion of the adjacent Met Park—turning an underused green area into a public park. In addition to the central green, the 2.5-acre park features a children’s playground with a jungle gym, small and large dog parks, and a community garden. Art pieces have been placed along the park’s forest walk.
The buildings feature 19 rooftop terraces, eight of which can be occupied. On a farm terrace, Amazon employees can volunteer to grow herbs and vegetables that will be donated to community organizations. The two towers also have more than 3,000 operable windows.
On the Building Team:
Owner: Amazon
Developer: JBG Smith
Design architect and architect of record: ZGF Architects
MEP engineer: GHT Limited Consulting
Structural engineer: Thornton Tomasetti
Construction: Clark Construction
Related Stories
| Oct 10, 2012
Foster + Partners to Design New 425 Park Avenue Tower
Conceptual designs submitted by Foster, Hadid, Koolhaas and Rogers to be on exhibit during Municipal Art Society’s Annual Symposium
| Oct 5, 2012
2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.
Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.
| Oct 5, 2012
2012 Reconstruction Award Bronze Winner: Walsh Group Training and Conference Center, Chicago, Ill.
With its Building Team partners—architect Solomon Cordwell Buenz, structural engineer CS Associates, and M/E engineer McGuire Engineers—Walsh Construction, acting as its own contractor, turned the former automobile showroom and paperboard package facility into a 93,000-sf showcase of sustainable design and construction.
| Oct 4, 2012
2012 Reconstruction Awards Gold Winner: Rice Fergus Miller Office & Studio, Bremerton, Wash.
Rice Fergus Miller bought a vacant and derelict Sears Auto and converted the 30,000 gsf space into the most energy-efficient commercial building in the Pacific Northwest on a construction budget of around $100/sf.
| Sep 24, 2012
Reed Construction completes Lafarge headquarters in Chicago
Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.
| Sep 13, 2012
Margulies Perruzzi Architects completes office design for Pioneer Investments
MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street.
| Sep 11, 2012
New York City releases first energy benchmarking data for private buildings
City is first in U.S. to disclose private-sector building energy data from a mandatory benchmarking policy.
| Sep 7, 2012
Goettsch Partners designs new tower in Abu Dhabi
Al Hilal Bank’s 24-story flagship development provides contemporary office space.
| Sep 7, 2012
Suffolk awarded One Channel Center project in Boston
Firm to manage $125 million, 525,000-sf office building project.
| Sep 7, 2012
Manhattan Construction Co. to build Fairfax office building
Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.