Amazon has completed construction of the first two buildings of its second headquarters, located in Arlington, Va. The all-electric structures, featuring low carbon concrete and mass timber, help further the company’s commitment to achieving net zero carbon emissions by 2040 and 100% renewable energy consumption by 2030.
Designed by ZGF Architects, the two 22-story buildings—comprising 2.1 million sf of space and 50,000 sf of retail space—are on track to become the largest LEED v4 Platinum buildings in the U.S., according to a statement from ZGF.
By using low-carbon concrete mixes and CarbonCure technology, the project achieved a 20% reduction in the concrete structures’ carbon footprint, compared to the industry baseline. ZGF incentivized trades to experiment with mixes and reduce greenhouse gas emissions. The firm’s open-source LCA calculator enabled construction partners to assess proposed concrete mixes and measure their impact.
The buildings capture and reuse rainwater, shower water, and HVAC condensation—helping to achieve 50% water savings below building code and recycle 7.5 million gallons a year. And more than four-fifths of all construction waste materials—including concrete, drywall, metals, wood, cardboard, and plastic—were diverted from landfills. This prevented over 17,000 tons of material from entering landfills.
Amazon funded the renovation and expansion of the adjacent Met Park—turning an underused green area into a public park. In addition to the central green, the 2.5-acre park features a children’s playground with a jungle gym, small and large dog parks, and a community garden. Art pieces have been placed along the park’s forest walk.
The buildings feature 19 rooftop terraces, eight of which can be occupied. On a farm terrace, Amazon employees can volunteer to grow herbs and vegetables that will be donated to community organizations. The two towers also have more than 3,000 operable windows.
On the Building Team:
Owner: Amazon
Developer: JBG Smith
Design architect and architect of record: ZGF Architects
MEP engineer: GHT Limited Consulting
Structural engineer: Thornton Tomasetti
Construction: Clark Construction
Related Stories
| Feb 20, 2013
Higher standards, efficiency programs keys to 40% energy usage reduction in commercial buildings since 1980
Commercial buildings have seen a drop in their energy intensity of more than 40% since 1980, according to a recent report from Bloomberg New Energy Finance and the Business Council for Sustainable Energy.
| Feb 20, 2013
CoreNet Global to real estate execs: 'Move forward on net-zero'
CoreNet Global, a major international association for corporate real estate and workplace executives, has released a public policy statement advocating adoption of net-zero energy buildings.
| Feb 17, 2013
Pakistan to get world's tallest tower in $45 billion deal
Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.
| Feb 14, 2013
Boxman Studios launches shipping container buildings division
Boxman Studios has launched a new division aimed at sustainable solutions for the Built Environment. The Boxman Studios Buildings Division will focus on the adaptive use of decommissioned shipping containers as architectural elements and even complete buildings.
| Feb 14, 2013
Guardian DiamondGuard installed in the Empire State Building
Guardian Industries DiamondGuard glass was recently installed on the 102nd story of the Empire State Building in New York City as part of an extensive renovation to update this venerable landmark.
| Feb 12, 2013
OMA's 'perimeter core' design wins competition for Essence Financial Building in Shenzhen
OMA partners David Gianotten and Rem Koolhaas rethink traditional office tower design with a plan that shifts the building's core to the edge for large, unobstructed plans.
| Feb 8, 2013
5 factors to consider when designing a shade system
Designing a shade system is more complex than picking out basic white venetian blinds. Here are five elements to consider when designing an interior shade system.
| Feb 6, 2013
RSMeans cost comparisons: office buildings and medical offices
RSMeans' February 2013 Cost Comparison Report breaks down the average construction costs per square foot for four types of office buildings across 25 metro markets.
| Feb 1, 2013
Delinquency rate for U.S. commercial real estate loans hits 11-month low
The delinquency rate for U.S. commercial real estate loans in CMBS fell 14 basis points in January to 9.57%. This is the lowest level in 11 months, according to Trepp, LLC's latest U.S. CMBS Delinquency Report.