flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Amazon’s second headquarters completes its first buildings: a pair of 22-story towers

Office Buildings

Amazon’s second headquarters completes its first buildings: a pair of 22-story towers

In Arlington, Va., the all-electric project helps further the company’s energy goals and provides a 2.5-acre public park.


By Novid Parsi, Contributing Editor | November 2, 2023
Photo: Magda Biernat Photography
Amazon funded the renovation and expansion of the adjacent Met Park—turning an underused green area into a public park. In addition to the central green, the 2.5-acre park features a children’s playground with a jungle gym, small and large dog parks, and a community garden. Art pieces have been placed along the park’s forest walk. Photo: Magda Biernat Photography

Amazon has completed construction of the first two buildings of its second headquarters, located in Arlington, Va. The all-electric structures, featuring low carbon concrete and mass timber, help further the company’s commitment to achieving net zero carbon emissions by 2040 and 100% renewable energy consumption by 2030. 

Designed by ZGF Architects, the two 22-story buildings—comprising 2.1 million sf of space and 50,000 sf of retail space—are on track to become the largest LEED v4 Platinum buildings in the U.S., according to a statement from ZGF.

By using low-carbon concrete mixes and CarbonCure technology, the project achieved a 20% reduction in the concrete structures’ carbon footprint, compared to the industry baseline. ZGF incentivized trades to experiment with mixes and reduce greenhouse gas emissions. The firm’s open-source LCA calculator enabled construction partners to assess proposed concrete mixes and measure their impact.

The buildings capture and reuse rainwater, shower water, and HVAC condensation—helping to achieve 50% water savings below building code and recycle 7.5 million gallons a year. And more than four-fifths of all construction waste materials—including concrete, drywall, metals, wood, cardboard, and plastic—were diverted from landfills. This prevented over 17,000 tons of material from entering landfills. 

Amazon funded the renovation and expansion of the adjacent Met Park—turning an underused green area into a public park. In addition to the central green, the 2.5-acre park features a children’s playground with a jungle gym, small and large dog parks, and a community garden. Art pieces have been placed along the park’s forest walk.

The buildings feature 19 rooftop terraces, eight of which can be occupied. On a farm terrace, Amazon employees can volunteer to grow herbs and vegetables that will be donated to community organizations. The two towers also have more than 3,000 operable windows.

On the Building Team:
Owner: Amazon
Developer: JBG Smith
Design architect and architect of record: ZGF Architects
MEP engineer: GHT Limited Consulting
Structural engineer: Thornton Tomasetti
Construction: Clark Construction

Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography
Amazon headquarters, Arlington, Va. Photo: Magda Biernat Photograph
Photo: Magda Biernat Photography

 

Related Stories

| Jun 17, 2013

First look: Austin to get first high-rise since 2003

Developer Cousins Properties broke ground on the 29-story Colorado Tower in downtown Austin, Texas, the city's first high-rise building since Cousins' completed the Frost Bank Tower a decade ago.

| Jun 17, 2013

DOE launches database on energy performance of 60,000 buildings

The Energy Department today launched a new Buildings Performance Database, the largest free, publicly available database of residential and commercial building energy performance information.

| Jun 13, 2013

7 great places that represent excellence in environmental design

An adaptive reuse to create LEED Platinum offices, a park that honors veterans, and a grand national plaza are among the seven projects named winners of the 2013 Great Places Awards. The Environmental Design and Research Association  recognize professional and scholarly excellence in environmental design, with special attention paid to the relationship between physical form and human activity or experience.

| Jun 12, 2013

5 building projects that put the 'team' in teamwork

The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team. 

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 6, 2013

Get smart about space utilization in the workplace

As we continue to look for more effective ways to improve the overall workplace experience, one tool we can use is measuring and analyzing space utilization.

| Jun 5, 2013

USGBC: Free LEED certification for projects in new markets

In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.

| Jun 4, 2013

SOM research project examines viability of timber-framed skyscraper

In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.

| Jun 3, 2013

Construction spending inches upward in April

The U.S. Census Bureau of the Department of Commerce announced today that construction spending during April 2013 was estimated at a seasonally adjusted annual rate of $860.8 billion, 0.4 percent above the revised March estimate of $857.7 billion.

| Jun 3, 2013

Trifecta of awards recognize Vision/Rubenstein campus, Bayer Healthcare HQ

When Vision Equities, LLC and Rubenstein Partners purchased the 200-acre former Alcatel-Lucent campus in Whippany a little more than two years ago, the partnership recognized the property’s potential to serve as a benchmark infill revitalization for the State of New Jersey.

boombox1
boombox2
native1

More In Category


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021