Today, April 4, the design proposal for Amazon’s newest building is scheduled to be presented at a Downtown Design Review meeting. The 17-story, 405,000-sf building, which is being designed by Graphite Design Group, will sit at the site of a former hotel at 2205 Seventh Avenue in Seattle.
According to Curbed Seattle, documents submitted by the architect for review give three options for building massing, with one of those options being preferred over the rest. The preferred option has a recessed center bay that shows the building’s internal stair structure. On either side of the recessed bay are stacked, protruding slabs of floors that zigzag their way up the building. The documents refer to this design as an ‘urban treehouse.”
Other building massing options include a version that again utilizes a recessed bay to show the internal stair structure, but instead of creating a zigzag pattern like the preferred option, the bay is a straight shot from the ground floor to the roof, with the occasional terrace off to the side. In the final of the three options, the internal stair structure is still visible, but instead of it being via a recessed bay, the stairs actually jut out from the rest of the building in three equal, staggered slabs.
The building site, which sits across Blanchard Street from Amazon’s Day One building, was purchased by Acorn Development LLC, an Amazon affiliate, for about $13 million in 2016.
Related Stories
| Dec 20, 2011
Research identifies most expensive U.S. commercial real estate markets
New York City, Washington, D.C. and San Mateo, Calif., rank highest in rents.
| Dec 20, 2011
Aragon Construction leading build-out of foursquare office
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.
| Dec 19, 2011
Chicago’s Aqua Tower wins international design award
Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Dec 14, 2011
Belfer Research Building tops out in New York
Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
| Dec 12, 2011
AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year
SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.