flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Amazon office building doubles as emergency housing for Seattle families

Office Buildings

Amazon office building doubles as emergency housing for Seattle families

The Amazon office dedicated eight floors to Mary's Place, a nonprofit that supports families experiencing homelessness.


By Quinn Purcell, Managing Editor | December 1, 2023
Mary’s Place Family Center for families experiencing homelessness
Mary’s Place Family Center, Seattle, Wash. Photo © Benjamin Benschneider, courtesy Graphite Design Group

In collaboration with Amazon, Graphite Design Group designed Mary’s Place Family Center, a nonprofit supporting families experiencing homelessness. The center provides emergency housing and services to families inside the downtown Seattle Amazon office building.

The unusual location for services of this kind serves over 300 people per day. Mary's Place spreads across eight of the office's floors—all designed by Graphite—testing the status quo for its experimental approach to homelessness support.

Emergency Housing for Seattle Families

Each floor provides various services and amenities for the sheltered:

  • Level P1: Parking, Storage, Facilities Workshop
  • Level G: Loading Dock and Staging, Storage, Dogwash
  • Level 1: Lobby, Multipurpose Room, Conference Room
  • Level 2: Diversion Sleep Floor
  • Level 3: Standard Sleep Floor
  • Level 4: Popsicle Place
  • Level 5: Popsicle Place
  • Level 6: Welcome and Intake, Heat Treat, Staff Area, Marketplace
  • Level 7: Dining Room, Full Kitchen, Play Area, Interfaith Prayer Room
  • Level 8: Rec Room, Terrace, Laundry, Games, Large Conference Room

 

Family in emergency housing shelter
Photo © Benjamin Benschneider, courtesy Graphite Design Group

While designing the center, Graphite invited Mary's Place staff to contribute ideas to best support guests. The group brainstormed words, images, and scenarios that eventually helped craft the space into a community-serving shelter.

Mary’s Place Family Center was also recognized at the AIA Seattle Honor Awards and the Council for Tall Buildings and Urban Habitat Awards for its novel approach to urban development. Graphite believes the project acts as a model for how other cities can activate underutilized space to answer larger urban housing challenges while balancing growth and social equity.

On the Building Team:
Owner: Amazon, Global Real Estate and Facilities team and Mary's Place
Developer: Seneca Group
Architect: Graphite Design Group
Structural/Civil Engineer: Coughlin Porter Lundeen
Electrical/Acoustic Engineer: Stantec
Mechanical/Energy Design: WSP
GC: GLY Construction

Related Stories

| Feb 20, 2013

CoreNet Global to real estate execs: 'Move forward on net-zero'

CoreNet Global, a major international association for corporate real estate and workplace executives, has released a public policy statement advocating adoption of net-zero energy buildings.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Feb 14, 2013

Boxman Studios launches shipping container buildings division

Boxman Studios has launched a new division aimed at sustainable solutions for the Built Environment. The Boxman Studios Buildings Division will focus on the adaptive use of decommissioned shipping containers as architectural elements and even complete buildings.

| Feb 14, 2013

Guardian DiamondGuard installed in the Empire State Building

Guardian Industries DiamondGuard glass was recently installed on the 102nd story of the Empire State Building in New York City as part of an extensive renovation to update this venerable landmark.

| Feb 12, 2013

OMA's 'perimeter core' design wins competition for Essence Financial Building in Shenzhen

OMA partners David Gianotten and Rem Koolhaas rethink traditional office tower design with a plan that shifts the building's core to the edge for large, unobstructed plans.

| Feb 8, 2013

5 factors to consider when designing a shade system

Designing a shade system is more complex than picking out basic white venetian blinds. Here are five elements to consider when designing an interior shade system.

| Feb 6, 2013

RSMeans cost comparisons: office buildings and medical offices

RSMeans' February 2013 Cost Comparison Report breaks down the average construction costs per square foot for four types of office buildings across 25 metro markets.

| Feb 1, 2013

Delinquency rate for U.S. commercial real estate loans hits 11-month low

The delinquency rate for U.S. commercial real estate loans in CMBS fell 14 basis points in January to 9.57%. This is the lowest level in 11 months, according to Trepp, LLC's latest U.S. CMBS Delinquency Report.

| Jan 31, 2013

The Opus Group completes construction of corporate HQ for Church & Dwight Co.

The Opus Group announced today the completion of construction on a new 250,000-square-foot corporate headquarter campus for Church & Dwight Co., Inc., in Ewing Township, near Princeton, N.J.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021