Alcoa Building and Construction Systems (BCS) named Donnie Hunter Architectural Manager for North America. In his new position, Hunter will lead a team responsible for the promotion of the Kawneer, Traco, and Reynobond brands to the architectural community with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.
Hunter’s career with Alcoa began in 1983 as a Sales Trainee for Kawneer for the Southern region working in the Jonesboro, Ga. manufacturing facility. From 1984 through 2001, he held various sales positions and was responsible for architectural promotion and customer sales in the Southern region. In 2001, Hunter joined Kawneer’s inaugural Architectural Services Team where he was responsible for providing architects with product application and technical assistance. He made the leap into product management in 2003 where he first worked as the Product Team Leader for Hurricane Resistant Products, later shifting to Product Manager, Protective Glazing Products, and most recently, Product Manager, Storefront, Entrances and Framing. During his tenure in this role, Hunter successfully launched seven new products and released major enhancements for four product lines.
Hunter is active in two major industry organizations: American Architectural Manufactures Association (AAMA) and American Standard for Testing of Materials (ASTM). He currently serves as co-chair of AAMA’s Storefront Manual Task Group and the BIM Task Group. Hunter holds a Bachelor’s Degree in Architectural Engineering from Southern Polytechnic State Institute and will receive his Master of Business Administration (MBA) from the University of Georgia’s Terry College of Business in August 2012. +
Related Stories
| May 10, 2012
Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond
Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.
| May 10, 2012
Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction
Certification for existing buildings under these two rating programs has overtaken that for new construction.
| May 10, 2012
Chapter 4 Business Case for High-Performance Reconstructed Buildings
Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.
| May 10, 2012
Chapter 3 How Building Technologies Contribute to Reconstruction Advances
Building Teams are employing a wide variety of components and systems in their reconstruction projects.
| May 10, 2012
Chapter 2 Exemplary High-Performance Reconstruction Projects
Several case studies show how to successfully renovate existing structures into high-performance buildings.
| May 9, 2012
Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings
As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.
| May 9, 2012
International green building speaker to keynote Australia’s largest building systems trade show
Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.
| May 9, 2012
Tishman delivers Revel six weeks early
Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.
| May 9, 2012
Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award
Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.