The AISC standard Prequalified Moment Connections for Special and Intermediate Steel Moment Frames for Seismic Applications (ANSI/AISC 358-10) has been updated with a second supplement, ANSI/AISC 358s2-14. The supplement adds the proprietary SidePlate moment connection to the roster of prequalified connections. The prequalified moment connection standard is an essential companion to the AISC Seismic Provisions (ANSI/AISC 341-10).
The supplemented standard now covers seven moment connections: reduced beam section connections; bolted stiffened and unstiffened extended end-plates; bolted flange plate connections; welded unreinforced flange-welded web connections; Kaiser bolted bracket connections; ConXtech CONXL connections; and SidePlate connections. Each connection chapter includes a step-by-step design procedure.
For ease of use, ANSI/AISC 358-10 and its supplements ANSI/AISC 358s1-11 and ANSI/AISC 358s2-14 are available as an integrated, single free download at www.aisc.org/aisc358. For more about the standard, see www.aisc.org/specifications.
(http://archives.informz.net/clients/aisc/archives/archive_4006887.html)
Related Stories
Codes and Standards | Feb 22, 2021
Preservation of Affordable Housing develops climate resilience strategy
Includes backup power for resident and staff “area of refuge”.
Codes and Standards | Feb 18, 2021
Construction industry moves toward comprehensive U.S. BIM standard
NIBS hosts roundtable to create coordinated program to advance collaboration.
Codes and Standards | Feb 17, 2021
Construction on international sports venues is ripe for corruption
Poor planning, complex contracting, a lack of accountability and high levels of collusion to blame.
Codes and Standards | Feb 16, 2021
Feds may fund removal of some urban highways
Senate bill proposes pilot program to reknit communities.
Codes and Standards | Feb 16, 2021
Bechtel joins international heat resilience organization
Experience designing resilience standards to aid effort to protect communities from extreme heat.
Codes and Standards | Feb 10, 2021
More than two-thirds of construction companies say COVID-19 has not impacted their ESOP
Half of survey respondents say 2020 project profitability decreased due to pandemic.
Codes and Standards | Feb 9, 2021
New Jersey approves new electric vehicle-ready home requirement
Homebuyers must be given option for charging station on new construction.
Codes and Standards | Feb 9, 2021
New California law removes barriers to residential development
Measure removes restrictions for ADUs in urban areas and master planned communities.
Codes and Standards | Feb 8, 2021
Alliance yields more accurate data for rating and certifying systems of construction materials
Crosswalk API offers trusted format to specify and procure healthier products.
Codes and Standards | Feb 4, 2021
2021 IBC requires automatic doors for entrances to public buildings
One door must be either a full power-operated door or a low-energy power-operated door.