flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The AISC prequalified seismic moment connection standard is now available

Codes and Standards

The AISC prequalified seismic moment connection standard is now available

You can download the 2016 version for free.


By Peter Fabris, Contributing Editor | November 7, 2016

Pixabay Public Domain

The 2016 version of the American Institute of Steel Construction (AISC) standard, Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications (ANSI/AISC 358-16) is now available for free downloading on the AISC website at www.aisc.org/aisc358

This updated version has been expanded to cover nine connections: 

• Reduced beam section moment connections 

• Bolted stiffened and unstiffened extended end-plate moment connections 

• Bolted flange plate moment connections 

• Welded unreinforced flange-welded web moment connections 

• Kaiser bolted bracket moment connections 

• ConXtech ConXL moment connections 

• SidePlate moment connections 

• Simpson Strong-Tie Strong Frame moment connections 

• Double-tee moment connections 

In addition to general requirements and limitations, each prequalified connection chapter includes a step-by-step design procedure. The new standard has been approved by the AISC Connection Prequalification Review Panel (CPRP) and is ANSI-accredited. 

“With the release of AISC 358-16, there are now nine prequalified beam-to-column moment connections for Special and Intermediate Moment Frames,” said Michael D. Engelhardt, chairman of the committee. “Work is already underway to prequalify additional connections and to extend the range of use for some of the existing prequalified connections, with the goal of providing designers with an ever growing range of options.”

Related Stories

Codes and Standards | Jan 21, 2020

Contractors pay practices reviewed in new database

Fastest and slowest paying GCs revealed.

Codes and Standards | Jan 17, 2020

Several states with ambitious climate goals will have to restrict natural gas as a fuel

Buildings would have to heat and cook with electricity.

Codes and Standards | Jan 16, 2020

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.

Codes and Standards | Jan 14, 2020

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.

Codes and Standards | Jan 13, 2020

Kansas City is first in nation to offer free public transportation

Aim is to increase mobility to spur more economic activity.

Codes and Standards | Jan 9, 2020

Dept. of Defense will require beefed up cybersecurity standards in January

All contractors will have to demonstrate secure practices.

Codes and Standards | Jan 8, 2020

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

ASHRAE 90.1 is the basis for new code that went into effect Oct. 1.

Codes and Standards | Jan 8, 2020

Energy efficiency initiatives have significantly cut energy consumption per square foot

Lighting and space heating fell by more than 600 trillion Btu from 2003 to 2012.

Building Technology | Jan 7, 2020

Tariff whiplash for bifacial solar modules

Bifacial solar systems offer many advantages over traditional systems.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021