flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The AISC prequalified seismic moment connection standard is now available

Codes and Standards

The AISC prequalified seismic moment connection standard is now available

You can download the 2016 version for free.


By Peter Fabris, Contributing Editor | November 7, 2016

Pixabay Public Domain

The 2016 version of the American Institute of Steel Construction (AISC) standard, Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications (ANSI/AISC 358-16) is now available for free downloading on the AISC website at www.aisc.org/aisc358

This updated version has been expanded to cover nine connections: 

• Reduced beam section moment connections 

• Bolted stiffened and unstiffened extended end-plate moment connections 

• Bolted flange plate moment connections 

• Welded unreinforced flange-welded web moment connections 

• Kaiser bolted bracket moment connections 

• ConXtech ConXL moment connections 

• SidePlate moment connections 

• Simpson Strong-Tie Strong Frame moment connections 

• Double-tee moment connections 

In addition to general requirements and limitations, each prequalified connection chapter includes a step-by-step design procedure. The new standard has been approved by the AISC Connection Prequalification Review Panel (CPRP) and is ANSI-accredited. 

“With the release of AISC 358-16, there are now nine prequalified beam-to-column moment connections for Special and Intermediate Moment Frames,” said Michael D. Engelhardt, chairman of the committee. “Work is already underway to prequalify additional connections and to extend the range of use for some of the existing prequalified connections, with the goal of providing designers with an ever growing range of options.”

Related Stories

Codes and Standards | Dec 11, 2018

Strict seismic building codes credited with minimizing damage in Alaskan earthquake

Magnitude 7.0 temblor cracked roads and collapsed road ramps, but buildings held up well.

Codes and Standards | Dec 7, 2018

Florida tops ABC’s 2018 Merit Shop Scorecard rankings

Michigan rose fastest after passing prevailing wage law.

Codes and Standards | Dec 6, 2018

North American steel yields lower GHG emissions than Chinese steel

North American construction steel saves about half of GHG emissions on building project.

Codes and Standards | Dec 5, 2018

Canadian retailer builds net-zero stores

Other chains also boost green efforts with PVs, EV charging stations.

Codes and Standards | Dec 4, 2018

Action on building codes would spur low-carbon cities

Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.

Codes and Standards | Nov 30, 2018

Best solution to prevent California wildfire disasters: Stop building in places likely to burn

Approach would be unpopular as people attracted to stunning wooded landscapes.

Codes and Standards | Nov 29, 2018

USGBC and BRE form partnership

Two green standards groups will collaborate on standards, platforms, and research.

Codes and Standards | Nov 29, 2018

Parking garages in N.Y. State will have to be inspected every three years

Professional engineer must assess conditions.

Codes and Standards | Nov 28, 2018

To build water-efficient cities, water managers and urban planners must coordinate better

Lack of time and resources, and practitioners not in habit of working together hamper efforts.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021