flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AISC, AIA release second part of design assist guidelines for the structural steel industry

Codes and Standards

AISC, AIA release second part of design assist guidelines for the structural steel industry

The guidelines are focused on design assist for fabricated structural steel projects. 


By Peter Fabris, Contributing Editor  | February 20, 2024
AISC, AIA release second part of design assist guidelines for the structural steel industry
The document describes the roles and responsibilities of various project participants and provides general guidelines about applying those strategies to fabricated structural steel projects. Image courtesy AISC

The American Institute of Steel Construction and AIA Contract Documents have released the second part of a document intended to provide guidance for three common collaboration strategies.

The document, Design Assist: Collaborative Design Approach Guidelines for the Fabricated Structural Steel Industry, is a follow-up to part one, Delegated Design, Design Assist, and Informal Involvement: What does it all mean?

The strategies covered are informal involvement, design assist, and delegated design. Part II focuses on the implementation of design assist in the fabricated structural steel industry. The document describes the roles and responsibilities of various project participants and provides general guidelines about applying those strategies to fabricated structural steel projects.

“Great teams drive great projects—and great teams rely on clear communication,” said Babette Freund, vice president of special projects, Dave Steel Company, Inc., and chair of AISC’s Code of Standard Practice Committee. “This paper aims to help project teams use design assist strategies to meet a defined project schedule and budget while minimizing the costs and disruptions that might arise from team misalignments.”

How AISC defines design assist for the structural steel industry

According to the guidelines, design assist is, "A form of collaboration where a structural steel fabricator and/or erector (or a fabricator/erector team under one contract, depending on project circumstances) provides information under a contract with the owner or other party as designated by the owner, to assist a structural engineer of record (SER) and other designated members of the design assist team with the design of the structural steel for buildings or building-like structures." 

Related Stories

Codes and Standards | Dec 20, 2021

Tension rises in California over state’s push to build more housing

Attorney general hints at lawsuits against cities that don’t comply with zoning reform.

Codes and Standards | Dec 17, 2021

Tension rises in California over state’s push to build more housing

Attorney general hints at lawsuits against cities that don’t comply with zoning reform.

Codes and Standards | Dec 16, 2021

Home builders defeat proposed Oklahoma energy conservation code upgrade

Builders cite high home prices for opposition.

Codes and Standards | Dec 16, 2021

Laws and regulations complicate growth of community solar gardens

New projects stymied by utility resistance and legislative restrictions.

Codes and Standards | Dec 16, 2021

Property owners need systematic approach to GHG emissions reduction

Energy hog buildings at risk for becoming stranded assets.

Codes and Standards | Dec 15, 2021

Design problems now the primary cause of construction claims and disputes

More likely to occur due to more tight timescales imposed upon third parties engaged in design.

Codes and Standards | Dec 13, 2021

ABC releases guide to technology for improving safety performance

Provides details on how to identify, choose, and implement technology.

Codes and Standards | Dec 8, 2021

Construction industry is the top target for cyberattacks

Smart building tech is a new avenue for criminals.

Codes and Standards | Dec 8, 2021

Proposals to add more multifamily to Atlanta prompt drive for Buckhead to secede

City aims to increase housing as projections point to sharp population increase.

Codes and Standards | Dec 7, 2021

Design problems now the primary cause of construction claims and disputes

More likely to occur due to more tight timescales imposed upon third parties engaged in design.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021