flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AISC, AIA release second part of design assist guidelines for the structural steel industry

Codes and Standards

AISC, AIA release second part of design assist guidelines for the structural steel industry

The guidelines are focused on design assist for fabricated structural steel projects. 


By Peter Fabris, Contributing Editor  | February 20, 2024
AISC, AIA release second part of design assist guidelines for the structural steel industry
The document describes the roles and responsibilities of various project participants and provides general guidelines about applying those strategies to fabricated structural steel projects. Image courtesy AISC

The American Institute of Steel Construction and AIA Contract Documents have released the second part of a document intended to provide guidance for three common collaboration strategies.

The document, Design Assist: Collaborative Design Approach Guidelines for the Fabricated Structural Steel Industry, is a follow-up to part one, Delegated Design, Design Assist, and Informal Involvement: What does it all mean?

The strategies covered are informal involvement, design assist, and delegated design. Part II focuses on the implementation of design assist in the fabricated structural steel industry. The document describes the roles and responsibilities of various project participants and provides general guidelines about applying those strategies to fabricated structural steel projects.

“Great teams drive great projects—and great teams rely on clear communication,” said Babette Freund, vice president of special projects, Dave Steel Company, Inc., and chair of AISC’s Code of Standard Practice Committee. “This paper aims to help project teams use design assist strategies to meet a defined project schedule and budget while minimizing the costs and disruptions that might arise from team misalignments.”

How AISC defines design assist for the structural steel industry

According to the guidelines, design assist is, "A form of collaboration where a structural steel fabricator and/or erector (or a fabricator/erector team under one contract, depending on project circumstances) provides information under a contract with the owner or other party as designated by the owner, to assist a structural engineer of record (SER) and other designated members of the design assist team with the design of the structural steel for buildings or building-like structures." 

Related Stories

Codes and Standards | Jan 25, 2018

OSHA penalties for violations increase

Fines adjusted for inflation in the New Year.

Codes and Standards | Jan 23, 2018

Disaster mitigation strategies that exceed code could save billions

Four dollars saved for every dollar spent, says NIBS report.

Codes and Standards | Jan 19, 2018

U.S. construction fatalities rose 6% in 2016

Falls accounted for 39% of deadly accidents.

Codes and Standards | Jan 18, 2018

Record storm surge in Boston prompts renewed calls for flood mitigation infrastructure

Newer buildings constructed in flood zone fared well.

Codes and Standards | Jan 17, 2018

Green Building Initiative acquires global rights to Green Globes from JLL

Transaction allows GBI to expand operations to Canada and elsewhere.

Codes and Standards | Jan 16, 2018

Engage code officials early for better building performance, predictable enforcement expectations

White paper says code officials should be collaborators and facilitators.

Codes and Standards | Jan 12, 2018

Arlington County, Va., earns first LEED for Communities Platinum Certification

Honor recognizes efforts to reduce greenhouse gas emissions, manage stormwater.

Codes and Standards | Jan 11, 2018

TRUE Zero Waste provides roadmap to divert waste away from landfills

USGBC program signs on more than 130 companies or facilities for certification.

Codes and Standards | Jan 10, 2018

Sliding-scale proposal for civil damages resulting from construction fatalities, injuries draws ire of trades

New York City Council proposal puts limits on penalties for safety violations leading to death, serious injury.

Codes and Standards | Jan 9, 2018

Federal appeals court orders EPA to revise lead standard within a year

Current exposure levels for lead in paint and dust have been in place for 17 years.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021