flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The Air Force awards a three-firm JV a 10-year contract as a preferred vendor

Military Construction

The Air Force awards a three-firm JV a 10-year contract as a preferred vendor

LEO A DALY, Arcadis, and EXP Federal will provide design and engineering services.


By John Caulfield, Senior Editor | May 9, 2021
The Air Force awards a $2B contract to three AEC firms

Over the next decade, a joint venture of LEO A DALY, Arcadis, and EXP Federal will provide design and engineering services in support of the Air Force's worldwide missions. Images: LEO A DALY

The U.S. Armed Forces are perennially significant spenders on construction and renovation. In its fiscal year 2021, the military branches were authorized by Congress to spend $7.8 billion for construction projects that included security and military housing, along with infrastructure, according to the Comptroller of the Department of Defense. Bagging a piece of that spending can be a bonanza for AEC firms, many of which have practices whose design, engineering, and construction services target government-funded work.

Case in point: The Air Force Civil Engineer Center and the 772nd Enterprise Sourcing Squadron have awarded a 10-year, $2 billion contract to a joint venture comprised of LEO A DALY, Arcadis, and EXP Federal for architecture, engineering, and other services in support of the Department of the Air Force’s missions worldwide.

The so-called AE NEXT 2021 Pool 4 contract, which is indefinite-delivery and -quantity, chose this JV team and 16 other contract winners as preferred vendors to execute design and construction projects for the Air Force and Space Force. The scope of that contract includes the design of new infrastructure and facilities, and the renovation, restoration, and modernization of existing infrastructure and facilities.

MILITARY WORK ‘NOBLE’ AND ‘A RESPONSIBILITY’

Arden Hills Readiness Center

The Arden Hills Readiness Center in Minnesota is one of LEO A DALY's recent military-funded projects.

 

LEO A DALY is the JV team’s managing partner. Arcadis—which employs 27,000 people in 70 countries—will contribute design services under this contract. And EXP Federal will provide secure technical, engineering, and mission support services.

Each of these firms has a long history of working with the military. EXP Federal has successfully completed projects for the DoD over the past 25 years, according to its website. In late 2019, the U.S. Army Corps of Engineers selected Arcadis to provide construction design, industrial assessments, and environmental engineering for the update of Watervliet Arsenal in New York and other North Atlantic Division installations.

Military-funded projects accounted for just under $32 million in billings for LEO A DALY in 2019 and 2020 combined. Those projects include the recently constructed 149,735-sf Arden Hills Readiness Center, which the Minnesota Army National Guard 34th Infantry Division uses for training exercises. (Stahl Construction was the GC.) LEO A DALY also has been working as historic treatment specialist for general contractor JE Dunn on the restoration of the U.S. Air Force Academy Cadet Chapel. That project’s architecture and engineering team includes the Air Force Civil Engineering Center, AECOM, Wiss Janney Elstner Associates, and Hartman-Cox Architects.

LEO A DALY provided architectural, engineering, and interior design services for the 160,000-sf VA Ambulatory Care Center that opened in Omaha, Neb., last August. Over the past two calendar years its work for the Veterans Administration brought in more than $35 million in billings.

“Federal work is noble work,” says Mike Huffsteller, Assoc. AIA, Corporate Director of Federal Programs and LEO A DALY. “Everything we do connects us in some way with the warfighter, the veteran, or those who serve of have served on the front lines of our nation.” Chris Koehler, Arcadis’ sales enablement director, frames working with the Air Force as “our responsibility as a firm with experience ensuring resilient outcomes for commercial and federal clients alike.”

Related Stories

| Sep 9, 2014

Using Facebook to transform workplace design

As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.

| Sep 7, 2014

Behind the scenes of integrated project delivery — successful tools and applications

The underlying variables and tools used to manage collaboration between teams is ultimately the driving for success with IPD, writes CBRE Healthcare's Megan Donham.

| Sep 7, 2014

Ranked: Top military sector AEC firms [2014 Giants 300 Report]

Balfour Beatty, Fluor, and HDR top BD+C's rankings of the nation's largest military sector design and construction firms, as reported in the 2014 Giants 300 Report.

| Sep 3, 2014

New designation launched to streamline LEED review process

The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

| Aug 6, 2014

25 projects win awards for design-build excellence

The 2014 Design-Build Project/Team Awards showcase design-build best practices and celebrate the achievements of owners and design-build teams in nine categories across the spectrum of horizontal and vertical construction. 

| Jul 28, 2014

Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]

Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.

| Jul 28, 2014

Reconstruction Sector Construction Firms [2014 Giants 300 Report]

Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Engineering Firms [2014 Giants 300 Report]

Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Architecture Firms [2014 Giants 300 Report]

Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

boombox1 - default
boombox2 -
native1 -

More In Category

Giants 400

Top 35 Military Facility Construction Firms for 2023

Hensel Phelps, DPR Construction, Walsh Group, and Whiting-Turner top BD+C's ranking of the nation's largest military facility general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report. 



Giants 400

Top 40 Military Facility Architecture Firms for 2023

Michael Baker International, HDR, Whitman, Requardt & Associates, and Stantec top BD+C's ranking of the nation's largest military facility architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.  


Giants 400

Top 170 Government Building Architecture Firms for 2023

Page Southerland Page, Gensler, Stantec, HOK, and Skidmore, Owings & Merrill top BD+C's ranking of the nation's largest government building sector architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes revenue from all government building sectors, including federal, state, local, military, and Veterans Affairs (VA) buildings.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021