flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA revises architect scope documents in latest contract form release

Codes and Standards

AIA revises architect scope documents in latest contract form release

Design-bid-build forms last updated in 2007.


By Peter Fabris, Contributing Editor | October 30, 2017

The American Institute of Architects (AIA) has released the second part of the 2017 edition of the A201 design-bid-build family of documents.

The contract forms are updated once every 10 years. This release includes updated versions of the Architect Scope documents and many frequently-used AIA forms. “We revised several of our most frequently used project forms, in part to coordinate them with other recently revised documents, but also to make them more efficient and user-friendly,” says Mike Koger, AIA, Esq., Manager and Counsel of AIA Contract Documents.

The updates include provisions related to things that go beyond basic architectural services. These “extra” services have become more prevalent in the industry in recent years and the updated documents include extensively revised architect scope documents to reflect this trend.

Major changes to Architect Scope documents include items related to:

  • Site Evaluation and Project Feasibility Services
  • Historic Preservation Services
  • On-Site Project Representation Services
  • Facility Support Services
  • Commissioning Services

 

Notable form changes include:

  • Certificate of Substantial Completion. Reorganized so the architect can sign the form, and include the date of substantial completion, immediately after the description of the work the architect is certifying.
  • Notice of Additional Services. Updated to allow an architect to satisfy the additional services notice requirements included in B101-2017, B103-2017, and B104-2017.
  • Amendment to the Professional Services Agreement. Revised to simplify the process to amend owner/architect agreements when additional services are not contemplated as part of the amendment. For such amendments, the owner and architect need only to describe the amendment, indicate changes to the architect’s compensation and schedule, and execute G802-2017 according to the underlying owner/architect agreement.

 

Visit www.aiacontracts.org/purchase for more information. Comparative versions showing the differences between the 2017 and 2007 editions are also available at www.aiacontracts.org/learn.

Related Stories

Codes and Standards | Aug 29, 2019

Code-conforming wood design guide available

The guide summarizes provisions for the use of wood and wood products in the 2018 IBC.

Codes and Standards | Aug 29, 2019

LEED residential market up 19% since 2017

The U.S. Green Building Council says that the LEED residential market has grown 19% since 2017. Nearly 500,000 single family, multifamily, and affordable housing units have been certified globally.

Codes and Standards | Aug 27, 2019

Slower speed limits in urban areas offer multiple benefits

Improved safety, better adoption of electric scooters and autonomous vehicles are possible if drivers ease off the accelerator.

Codes and Standards | Aug 27, 2019

Oregon rescinds tsunami-zone construction ban

Other states have no ban, but have strengthened building codes for tidal wave resilience.

Urban Planning | Aug 27, 2019

Pop-up parks revitalize empty lots

Pop-up parks that provide instant open areas for public use and programming can revitalize under-utilized spaces and add vibrancy to neighborhoods. 

Codes and Standards | Aug 22, 2019

Texas flood prevention initiative would create nation’s most ambitious barrier system

Plan including sand dunes and mechanical barriers would cost as much as $32 billion.

Codes and Standards | Aug 22, 2019

Multimedia app identifies construction hazards

Researchers say program will reduce injuries, save lives.

Codes and Standards | Aug 22, 2019

Cities take action to keep cool as climate heats up

Initiatives include cool streets, cool roofs, and broader urban tree canopy.

Codes and Standards | Aug 22, 2019

5G expected to give a boost to construction technology

Virtual reality, Internet of Things, robotics, and drones will all benefit from enhanced data flows.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021