The American Institute of Architects (AIA) has released the second part of the 2017 edition of the A201 design-bid-build family of documents.
The contract forms are updated once every 10 years. This release includes updated versions of the Architect Scope documents and many frequently-used AIA forms. “We revised several of our most frequently used project forms, in part to coordinate them with other recently revised documents, but also to make them more efficient and user-friendly,” says Mike Koger, AIA, Esq., Manager and Counsel of AIA Contract Documents.
The updates include provisions related to things that go beyond basic architectural services. These “extra” services have become more prevalent in the industry in recent years and the updated documents include extensively revised architect scope documents to reflect this trend.
Major changes to Architect Scope documents include items related to:
- Site Evaluation and Project Feasibility Services
- Historic Preservation Services
- On-Site Project Representation Services
- Facility Support Services
- Commissioning Services
Notable form changes include:
- Certificate of Substantial Completion. Reorganized so the architect can sign the form, and include the date of substantial completion, immediately after the description of the work the architect is certifying.
- Notice of Additional Services. Updated to allow an architect to satisfy the additional services notice requirements included in B101-2017, B103-2017, and B104-2017.
- Amendment to the Professional Services Agreement. Revised to simplify the process to amend owner/architect agreements when additional services are not contemplated as part of the amendment. For such amendments, the owner and architect need only to describe the amendment, indicate changes to the architect’s compensation and schedule, and execute G802-2017 according to the underlying owner/architect agreement.
Visit www.aiacontracts.org/purchase for more information. Comparative versions showing the differences between the 2017 and 2007 editions are also available at www.aiacontracts.org/learn.
Related Stories
Codes and Standards | Mar 4, 2021
Biden administration overturns Trump’s federal building design mandate
Previous order promoted classical and “traditional” architecture above others.
Codes and Standards | Mar 3, 2021
Texas freeze raises questions about risks of electrifying buildings
Gas stoves helped residents cook, boil water when power went out.
Codes and Standards | Mar 2, 2021
New Seattle building code eliminates fossil fuels for most space and water heating
Also increases on-site solar photovoltaics, reduces envelope heat loss, air leakage, and interior lighting power allowances.
Codes and Standards | Feb 25, 2021
It’s not just lumber—roofing material prices are also on the rise
Lower demand for petroleum products means less asphalt production.
Codes and Standards | Feb 23, 2021
USGBC offers education on LEED Safety First pilot credits
Four courses address COVID-19.
Codes and Standards | Feb 23, 2021
ASHRAE Epidemic Task Force releases updated Building Readiness Guide
Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.
Codes and Standards | Feb 22, 2021
Preservation of Affordable Housing develops climate resilience strategy
Includes backup power for resident and staff “area of refuge”.
Codes and Standards | Feb 18, 2021
Construction industry moves toward comprehensive U.S. BIM standard
NIBS hosts roundtable to create coordinated program to advance collaboration.
Codes and Standards | Feb 17, 2021
Construction on international sports venues is ripe for corruption
Poor planning, complex contracting, a lack of accountability and high levels of collusion to blame.
Codes and Standards | Feb 16, 2021
Feds may fund removal of some urban highways
Senate bill proposes pilot program to reknit communities.