flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA revises architect scope documents in latest contract form release

Codes and Standards

AIA revises architect scope documents in latest contract form release

Design-bid-build forms last updated in 2007.


By Peter Fabris, Contributing Editor | October 30, 2017

The American Institute of Architects (AIA) has released the second part of the 2017 edition of the A201 design-bid-build family of documents.

The contract forms are updated once every 10 years. This release includes updated versions of the Architect Scope documents and many frequently-used AIA forms. “We revised several of our most frequently used project forms, in part to coordinate them with other recently revised documents, but also to make them more efficient and user-friendly,” says Mike Koger, AIA, Esq., Manager and Counsel of AIA Contract Documents.

The updates include provisions related to things that go beyond basic architectural services. These “extra” services have become more prevalent in the industry in recent years and the updated documents include extensively revised architect scope documents to reflect this trend.

Major changes to Architect Scope documents include items related to:

  • Site Evaluation and Project Feasibility Services
  • Historic Preservation Services
  • On-Site Project Representation Services
  • Facility Support Services
  • Commissioning Services

 

Notable form changes include:

  • Certificate of Substantial Completion. Reorganized so the architect can sign the form, and include the date of substantial completion, immediately after the description of the work the architect is certifying.
  • Notice of Additional Services. Updated to allow an architect to satisfy the additional services notice requirements included in B101-2017, B103-2017, and B104-2017.
  • Amendment to the Professional Services Agreement. Revised to simplify the process to amend owner/architect agreements when additional services are not contemplated as part of the amendment. For such amendments, the owner and architect need only to describe the amendment, indicate changes to the architect’s compensation and schedule, and execute G802-2017 according to the underlying owner/architect agreement.

 

Visit www.aiacontracts.org/purchase for more information. Comparative versions showing the differences between the 2017 and 2007 editions are also available at www.aiacontracts.org/learn.

Related Stories

Codes and Standards | Jun 2, 2021

Dept. of Energy releases EnergyPlus and OpenStudio updates

New features include Python Plugin features and additional tabular reporting options.

Codes and Standards | Jun 1, 2021

Federal plan to double Canadian lumber tariffs draws intense criticism

Builders advised to stock up to deal with shortages.

Codes and Standards | Jun 1, 2021

Passive House standards proving their worth in multifamily sector

Energy performance beats conventionally built by 32% to 58%.

Codes and Standards | May 27, 2021

Pittsburgh combats construction fraud

Crackdown on tax, insurance, and workers’ comp malfeasance.

Codes and Standards | May 26, 2021

Proposal to add photovoltaic panels to the R2 Standard for electronics recycling

Hundreds of facilities in 33 countries could begin recycling PVs.

Codes and Standards | May 25, 2021

International Energy Agency lays out roadmap to net zero

Focus is on energy generation, but building efficiency also plays a role.

Codes and Standards | May 24, 2021

Biden Administration will make new investments in building energy efficiency

Focus on grid-interactive buildings; Energy Star expansion; new targets for energy, water reduction.

Codes and Standards | May 20, 2021

Solar panel trade group issues guidelines to rid use of components built with forced labor

Growing concern that PV industry is dependent on work camps in China.

Codes and Standards | May 19, 2021

Smart electric panels can aid transition to renewable energy

Allow customers better control of circuits; utilities can better manage demand.

Codes and Standards | May 18, 2021

Cross-laminated timber performs better than expected in shear test

Tests conducted in support of new criteria for design of CLT diaphragm.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021