The American Institute of Architects (AIA) has released the second part of the 2017 edition of the A201 design-bid-build family of documents.
The contract forms are updated once every 10 years. This release includes updated versions of the Architect Scope documents and many frequently-used AIA forms. “We revised several of our most frequently used project forms, in part to coordinate them with other recently revised documents, but also to make them more efficient and user-friendly,” says Mike Koger, AIA, Esq., Manager and Counsel of AIA Contract Documents.
The updates include provisions related to things that go beyond basic architectural services. These “extra” services have become more prevalent in the industry in recent years and the updated documents include extensively revised architect scope documents to reflect this trend.
Major changes to Architect Scope documents include items related to:
- Site Evaluation and Project Feasibility Services
- Historic Preservation Services
- On-Site Project Representation Services
- Facility Support Services
- Commissioning Services
Notable form changes include:
- Certificate of Substantial Completion. Reorganized so the architect can sign the form, and include the date of substantial completion, immediately after the description of the work the architect is certifying.
- Notice of Additional Services. Updated to allow an architect to satisfy the additional services notice requirements included in B101-2017, B103-2017, and B104-2017.
- Amendment to the Professional Services Agreement. Revised to simplify the process to amend owner/architect agreements when additional services are not contemplated as part of the amendment. For such amendments, the owner and architect need only to describe the amendment, indicate changes to the architect’s compensation and schedule, and execute G802-2017 according to the underlying owner/architect agreement.
Visit www.aiacontracts.org/purchase for more information. Comparative versions showing the differences between the 2017 and 2007 editions are also available at www.aiacontracts.org/learn.
Related Stories
Codes and Standards | Jun 2, 2021
Dept. of Energy releases EnergyPlus and OpenStudio updates
New features include Python Plugin features and additional tabular reporting options.
Codes and Standards | Jun 1, 2021
Federal plan to double Canadian lumber tariffs draws intense criticism
Builders advised to stock up to deal with shortages.
Codes and Standards | Jun 1, 2021
Passive House standards proving their worth in multifamily sector
Energy performance beats conventionally built by 32% to 58%.
Codes and Standards | May 27, 2021
Pittsburgh combats construction fraud
Crackdown on tax, insurance, and workers’ comp malfeasance.
Codes and Standards | May 26, 2021
Proposal to add photovoltaic panels to the R2 Standard for electronics recycling
Hundreds of facilities in 33 countries could begin recycling PVs.
Codes and Standards | May 25, 2021
International Energy Agency lays out roadmap to net zero
Focus is on energy generation, but building efficiency also plays a role.
Codes and Standards | May 24, 2021
Biden Administration will make new investments in building energy efficiency
Focus on grid-interactive buildings; Energy Star expansion; new targets for energy, water reduction.
Codes and Standards | May 20, 2021
Solar panel trade group issues guidelines to rid use of components built with forced labor
Growing concern that PV industry is dependent on work camps in China.
Codes and Standards | May 19, 2021
Smart electric panels can aid transition to renewable energy
Allow customers better control of circuits; utilities can better manage demand.
Codes and Standards | May 18, 2021
Cross-laminated timber performs better than expected in shear test
Tests conducted in support of new criteria for design of CLT diaphragm.