flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA releases nine new contract documents

Architects

AIA releases nine new contract documents

Include six new forms for design-build projects.


By Peter Fabris, Contributing Editor | November 10, 2015
AIA releases nine new contract documents

Photo: Mark Kaletka/Creative Commons

The American Institute of Architects has released nine new contract documents.

They include a new owner/consultant agreement with two accompanying scope of service exhibits for land surveying and geotechnical engineering. Six new administrative forms for use on design-build projects are also available.

“Our customers expressed a need for a standard form of agreement owners could use to engage necessary consultants and leverage their expertise,” says Kenneth Cobleigh, Managing Director & Counsel, AIA Contract Documents. “The new C103 document addresses that need. These additions also cap off our design-build family of documents, which are preferred by the industry at large for commercial design-build projects.”

The C103–2015, Standard Form of Agreement Between Owner and Consultant without a Predefined Scope of Consultant’s Services, establishes expectations between an owner and consultant on a project. The agreement contains basic business terms related to copyrights and licenses, claims and disputes, termination or suspension, and compensation.

The new documents are currently available through the latest version of the AIA Contract Documents desktop software, as well as individually through AIA Documents-on-Demand and AIA Documents-on-Demand Plus.

Tags

Related Stories

| Oct 31, 2014

Dubai plans world’s next tallest towers

Emaar Properties has unveiled plans for a new project containing two towers that will top the charts in height, making them the world’s tallest towers once completed.

| Oct 30, 2014

CannonDesign releases guide for specifying flooring in healthcare settings

The new report, "Flooring Applications in Healthcare Settings," compares and contrasts different flooring types in the context of parameters such as health and safety impact, design and operational issues, environmental considerations, economics, and product options.

| Oct 30, 2014

Perkins Eastman and Lee, Burkhart, Liu to merge practices

The merger will significantly build upon the established practices—particularly healthcare—of both firms and diversify their combined expertise, particularly on the West Coast. 

| Oct 29, 2014

Better guidance for appraising green buildings is steadily emerging

The Appraisal Foundation is striving to improve appraisers’ understanding of green valuation.

| Oct 29, 2014

Increasing number of design projects meeting carbon reduction targets, says AIA report

Of the 2,464 projects accounted for in AIA's 2030 Commitment 2013 Progress Report, 401 are meeting the 60% carbon reduction target—a 200% increase from 2012.  

Sponsored | | Oct 29, 2014

What’s the difference between your building’s coating chalking and fading?

While the reasons for chalk and fade are different, both occurrences are something to watch for. SPONSORED CONTENT

Sponsored | | Oct 29, 2014

Historic Washington elementary school incorporates modular design

More and more architects and designers are leveraging modern modular building techniques for expansion projects planned on historical sites. SPONSORED CONTENT

| Oct 29, 2014

Diller Scofidio + Renfro selected to design Olympic Museum in Colorado Springs

The museum is slated for an early 2018 completion, and will include a hall of fame, theater, retail space, and a 20,000-sf hall that will showcase the history of the Olympics and Paralympics.

Smart Buildings | Oct 29, 2014

SCAPE’s 'living breakwaters' resiliency development wins 2014 Buckminster Fuller Challenge

New York-based landscape architecture firm SCAPE won the Buckminster Fuller Institute’s 2014 Fuller Challenge, billed as socially responsible design’s highest award.

| Oct 28, 2014

4 keys to mastering 'design thinking' and the iteration process

When using design thinking and iteration, we’ll sometimes spend multiple days iterating idea after idea, heads down, only to realize we still don’t have it right, writes HDR's Amy Lussetto. She offers tips for success with these idea-nurturing tools.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021