The American Institute of Architects has released AIA Document C203 – 2017 Standard Form of Consultant’s Services: Commissioning.
C203-2017 replaces B211-2007, Standard Form of Architect’s Services: Commissioning. The form is intended to be used as a supplement to AIA Document C103–2015, Standard Form of Agreement Between Owner and Consultant without a Predefined Scope of Consultant’s Services as a guide for drawing up a contract for commissioning services.
C203 is no longer written as an architect’s scope of services. Instead, it can also be used to hire professionals with other backgrounds to perform commissioning services.
Notable changes in the new form include:
- Provisions describing the consultant’s role to assist in preparing the owner’s project
- A more detailed description of the consultant’s commissioning plan
- Updated provisions related to commissioning-related design reviews
- Updated provisions related to the consultant’s role in commissioning during the construction phase of the project
- An expanded initial information section
- Updated provisions for supplemental services
The new document is intended to allow for modifications to fit individual projects so that modifications are easily distinguished from the original, printed language. For more information, visit: https://www.aiacontracts.org/.
Related Stories
Industry Research | Sep 12, 2016
Evidence linking classroom design to improved learning mounts
A study finds the impact can be as much as 25% per year.
Legislation | Sep 8, 2016
Half of U.S. states now allow design-build on public projects
Missouri is the latest to enact design-build legislation.
Codes and Standards | Sep 8, 2016
Vapor intrusion risk addressed in new ASTM guide update
The updates address industry confusion over how to handle the issue.
BIM and Information Technology | Sep 7, 2016
Energy Star Portfolio Manager tool updated to factor in waste management
The costs and benefits of managing 29 types of waste are now included.
Wood | Sep 6, 2016
Atlanta suburb prohibits wood-framed construction for high rises
The new building code prevents any structure with more than three stories from being built from a CLT frame.
Codes and Standards | Sep 1, 2016
Overuse of air conditioning hurts office productivity
A study found temperatures in the low 70s reduce worker performance.
Regulations | Aug 31, 2016
FEMA wants to toughen flood regulation on projects using federal funds
The proposal ‘would essentially rewrite the current 100-year flood standard.’
Sustainability | Aug 30, 2016
New federal project plans must include climate impacts
Agencies must quantify the specific impacts when possible.
Green | Aug 29, 2016
Vancouver, B.C., to require zero emissions on new buildings by 2030
No net GHG emissions will be allowed.
Codes and Standards | Aug 25, 2016
Freddie Mac extends efforts to fund multifamily energy/water efficiency projects
The Multifamily Green Advantage targets existing buildings.