One of the most notable changes is a new Contractor-Subcontractor Master Agreement and accompanying work order. The new agreement allows a contractor and subcontractor to agree to a predefined set of terms and conditions that apply to multiple scopes of work.
The Joint Venture Agreement for Professional Services also got a significant update. It was revamped to address the legal implications associated with joint venture business relationships.
Other documents that underwent notable changes include Master Agreements, which now align with the 2017 core AIA document updates; Instructions to Bidders, which now include designation of Bidding Documents in electronic form or paper copy; and Architect-Consultant Agreement for Special Services, which now includes the copyrights, licenses, and payment provisions of the prime agreement. Mediation was added as a precedent to binding dispute resolution.
Related Stories
Codes and Standards | Sep 16, 2016
Calm weather tidal flooding impacting several communities on East and Gulf Coasts
Local officials face the prospect of costly mitigation projects.
Codes and Standards | Sep 15, 2016
OSHA appoints new director for its construction directorate
The forty-year industry veteran has been a GC and business owner.
Energy | Sep 13, 2016
Oberlin College to hold conference on post-fossil fuel economy
The gathering will address climate change and new sources of energy.
Industry Research | Sep 12, 2016
Evidence linking classroom design to improved learning mounts
A study finds the impact can be as much as 25% per year.
Legislation | Sep 8, 2016
Half of U.S. states now allow design-build on public projects
Missouri is the latest to enact design-build legislation.
Codes and Standards | Sep 8, 2016
Vapor intrusion risk addressed in new ASTM guide update
The updates address industry confusion over how to handle the issue.
BIM and Information Technology | Sep 7, 2016
Energy Star Portfolio Manager tool updated to factor in waste management
The costs and benefits of managing 29 types of waste are now included.
Wood | Sep 6, 2016
Atlanta suburb prohibits wood-framed construction for high rises
The new building code prevents any structure with more than three stories from being built from a CLT frame.
Codes and Standards | Sep 1, 2016
Overuse of air conditioning hurts office productivity
A study found temperatures in the low 70s reduce worker performance.
Regulations | Aug 31, 2016
FEMA wants to toughen flood regulation on projects using federal funds
The proposal ‘would essentially rewrite the current 100-year flood standard.’