flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA launches stalled projects database

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.


By By BD+C Staff | November 29, 2011
AIA stalled projects database
The stalled projects website helps address one of the persistent impediments facing the design and construction sector, which ac
This article first appeared in the December 2011 issue of BD+C.

The American Institute of Architects (AIA) announced that it has launched an online database that will let developers and architects network with investors interested in lending to projects that have been stalled primarily due to lack of financing.

The AIA designed the database, housed at www.aia.org/stalledprojects, to help address one of the persistent impediments facing the design and construction sector, which accounts for $1 in $9 of U.S. Gross Domestic Product, according to the U.S. Census Bureau. Each $1 million in new construction spending supports 28.5 full-time, year-round-equivalent jobs, according to a study by George Mason University economist Stephen J. Fuller.

“In large part the fortunes of the entire U.S. economy rest on whether the design and construction industry can create jobs,” said AIA President Clark Manus, FAIA. “For months, our industry has continued to suffer primarily because banks won’t lend. With this unprecedented online database portal, the AIA has decided to do something that could create more jobs and help grow the economy.”

The credit crunch crisis in design and construction shows no signs of abating. A report issued by the AIA’s economics and market research group finds that the share of projects stalled due to financing problems through August 2011 has almost doubled since 2008 and that one-in-five stalled projects directly result from financing problems. Indeed, almost two-thirds of architects responding to a May AIA survey reported at least one project stalled due to lack of financing.

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals. Since going live on October 31, the site has attracted projects seeking a total of almost $230 million in financing. The AIA expects these numbers to grow as word spreads throughout the architecture profession about this initiative.

“The four-month project to create this one-of-a-kind portal represents a comprehensive, intense effort by this organization to address an issue of vital importance to our members and to the economy in general,” said the AIA’s EVP and Chief Executive Officer Robert Ivy, FAIA. “As this initiative takes hold, we hope that the AIA’s Stalled Projects Page will prove to be an immense asset to architects, builders and developers throughout the country.”

By creating a login and clicking inside the “Get Started Now” box on the site, architects and developers can fill out a form and tell investors about their projects. By clicking in that same box, investors list their companies and tell project leaders about their firms and the types of investments they are interested in making. Once registered, both project owner and investor can see details on stalled projects or peruse investor information. BD+C

Related Stories

Modular Building | Jan 19, 2024

Building with shipping containers not as eco-friendly as it seems

With millions of shipping containers lying empty at ports around the world, it may seem like repurposing them to construct buildings would be a clear environmental winner. The reality of building with shipping containers is complicated, though, and in many cases isn’t a net-positive for the environment, critics charge, according to a report by NPR's Chloe Veltman.

Adaptive Reuse | Jan 18, 2024

Coca-Cola packaging warehouse transformed into mixed-use complex

The 250,000-sf structure is located along a now defunct railroad line that forms the footprint for the city’s multi-phase Beltline pedestrian/bike path that will eventually loop around the city.

Sponsored | BD+C University Course | Jan 17, 2024

Waterproofing deep foundations for new construction

This continuing education course, by Walter P Moore's Amos Chan, P.E., BECxP, CxA+BE, covers design considerations for below-grade waterproofing for new construction, the types of below-grade systems available, and specific concerns associated with waterproofing deep foundations.

Sponsored | Performing Arts Centers | Jan 17, 2024

Performance-based facilities for performing arts boost the bottom line

A look at design trends for “budget-wise” performing arts facilities reveals ways in which well-planned and well-built facilities help performers and audiences get the most out of the arts. This continuing education course is worth 1.0 AIA learning unit.

Giants 400 | Jan 15, 2024

Top 130 Hospital Facility Architecture Firms for 2023

HKS, HDR, Stantec, CannonDesign, and Page Southerland Page top BD+C's ranking of the nation's largest hospital facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report.

Airports | Jan 15, 2024

How to keep airports functional during construction

Gensler's aviation experts share new ideas about how to make the airport construction process better moving forward.

Adaptive Reuse | Jan 12, 2024

Office-to-residential conversions put pressure on curbside management and parking

With many office and commercial buildings being converted to residential use, two important issues—curbside management and parking—are sometimes not given their due attention. Cities need to assess how vehicle storage, bike and bus lanes, and drop-off zones in front of buildings may need to change because of office-to-residential conversions.

MFPRO+ News | Jan 12, 2024

As demand rises for EV chargers at multifamily housing properties, options and incentives multiply

As electric vehicle sales continue to increase, more renters are looking for apartments that offer charging options.

Student Housing | Jan 12, 2024

UC Berkeley uses shipping containers to block protestors of student housing project

The University of California at Berkeley took the drastic step of erecting a wall of shipping containers to keep protestors out of a site of a planned student housing complex. The $312 million project would provide badly needed housing at the site of People’s Park. 

Giants 400 | Jan 12, 2024

Top 10 Casino Architecture Firms for 2023

JCJ Architecture, HBG Design, Gensler, and WATG top BD+C's ranking of the nation's largest casino architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report.

boombox1
boombox2
native1

More In Category


Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021