flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA launches stalled projects database

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.


By By BD+C Staff | November 29, 2011
AIA stalled projects database
The stalled projects website helps address one of the persistent impediments facing the design and construction sector, which ac
This article first appeared in the December 2011 issue of BD+C.

The American Institute of Architects (AIA) announced that it has launched an online database that will let developers and architects network with investors interested in lending to projects that have been stalled primarily due to lack of financing.

The AIA designed the database, housed at www.aia.org/stalledprojects, to help address one of the persistent impediments facing the design and construction sector, which accounts for $1 in $9 of U.S. Gross Domestic Product, according to the U.S. Census Bureau. Each $1 million in new construction spending supports 28.5 full-time, year-round-equivalent jobs, according to a study by George Mason University economist Stephen J. Fuller.

“In large part the fortunes of the entire U.S. economy rest on whether the design and construction industry can create jobs,” said AIA President Clark Manus, FAIA. “For months, our industry has continued to suffer primarily because banks won’t lend. With this unprecedented online database portal, the AIA has decided to do something that could create more jobs and help grow the economy.”

The credit crunch crisis in design and construction shows no signs of abating. A report issued by the AIA’s economics and market research group finds that the share of projects stalled due to financing problems through August 2011 has almost doubled since 2008 and that one-in-five stalled projects directly result from financing problems. Indeed, almost two-thirds of architects responding to a May AIA survey reported at least one project stalled due to lack of financing.

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals. Since going live on October 31, the site has attracted projects seeking a total of almost $230 million in financing. The AIA expects these numbers to grow as word spreads throughout the architecture profession about this initiative.

“The four-month project to create this one-of-a-kind portal represents a comprehensive, intense effort by this organization to address an issue of vital importance to our members and to the economy in general,” said the AIA’s EVP and Chief Executive Officer Robert Ivy, FAIA. “As this initiative takes hold, we hope that the AIA’s Stalled Projects Page will prove to be an immense asset to architects, builders and developers throughout the country.”

By creating a login and clicking inside the “Get Started Now” box on the site, architects and developers can fill out a form and tell investors about their projects. By clicking in that same box, investors list their companies and tell project leaders about their firms and the types of investments they are interested in making. Once registered, both project owner and investor can see details on stalled projects or peruse investor information. BD+C

Related Stories

Architects | Jul 19, 2022

Perkins Eastman Bolsters Its Dallas Studio with 5 Dynamic New Principals

Seasoned staff bring talent, experience, and enthusiasm to expand firm.

Energy-Efficient Design | Jul 19, 2022

All is not lost: 3 ways architects can respond to the Supreme Court’s EPA ruling

The U.S. Supreme Court’s ruling to limit the Environmental Protection Agency’s power to regulate greenhouse gas (GHG) emissions from power plants dealt a significant blow to our ability to fight the climate crisis with federal policy.

Office Buildings | Jul 19, 2022

Austin adaptive reuse project transforms warehouse site into indoor-outdoor creative office building

Fifth and Tillery, an adaptive reuse project, has revitalized a post-industrial site in East Austin, Texas.

Women in Design+Construction | Jul 18, 2022

Registration is open for BD+C's 2022 Women in Design+Construction Conference

Join your AEC industry peers in Chicago, September 26-28, 2022, for the 7th annual Women in Design+Construction Conference, hosted by the BD+C editorial team and the 35-person WIDC Advisory Board. 

Airports | Jul 18, 2022

FAA will award nearly $1 billion for airport projects

The Federal Aviation Administration (FAA) will award nearly $1 billion to 85 airports of all sizes across the country to improve terminals.

Building Team | Jul 18, 2022

Understanding the growing design-build market

FMI’s new analysis of the design-build market forecast for the next fives years shows that this delivery method will continue to grow, despite challenges from the COVID-19 pandemic.

Mixed-Use | Jul 18, 2022

Mixed-use development outside Prague uses a material made from leftover bricks

Outside Prague, the Sugar Factory, a mixed-used residential development with public space, marks the largest project to use the sustainable material Rebetong. 

Building Team | Jul 15, 2022

ABC: Construction materials prices increased in June, up 20% from a year ago

Construction input prices increased 1.9% in June compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics’ Producer Price Index data released today.

Arenas | Jul 15, 2022

U. of Oregon renovation aims for ‘finest track and field facility in the world’

The renovation of the University of Oregon’s Hayward Field had the goal of creating the “finest track and field facility in the world.”

Building Team | Jul 14, 2022

ABC’s construction backlog inches lower in June; Contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator fell 0.1 months in June and stands at 8.9 months, according to an ABC member survey conducted June 21 to July 5.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021