The AIA announced that it has incorporated seven new documents into AIA Documents-on-Demand, bringing the total number of documents available through this service to 86.
The latest addition to Documents-on-Demand includes documents from the A series for Owner/Contractor and the B series for Owner/Architect. Overall, 41 total agreements and forms are now included in Documents-on-Demand that are specifically suited for contractors and three specifically for sub-contractors. AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.
"Documents-on-Demand is a streamlined portal that helps my company access the most important documents we need from AIA Contract Documents," said Shawn Brothers, Contractor at Cronin Construction, Inc. "And, the documents are incredibly easy to use once purchased and downloaded."
AIA Documents-on-Demand is a popular, cost effective, Web-based service that enables both PC and MAC users to easily access, electronically fill out, and print the latest AIA Contract Documents anytime and anywhere with access to the Internet and a printer. Last year, more than 35,000 documents were downloaded through Documents-on-Demand. "Since the relaunch of Documents-on-Demand in 2009, the service has proven incredibly popular and user-friendly as a result of its ease and flexibility," said Molly Lindblom, Managing Director of AIA Contract Documents. "Documents-on-Demand is continuously updated with the latest documents to help meet the changing needs of design and construction industry professionals."
The following documents have been added to AIA Documents-on-Demand:
- A151-2007, Standard Form of Agreement Between Owner and Vendor for Furniture, Furnishings and Equipment where the basis of payment is a Stipulated Sum
- A251-2007, General Conditions of the Contract for Furniture, Furnishings and Equipment
- A751-2007, Invitation and Instructions for Quotation for Furniture, Furnishings and Equipment
- B152-2007, Standard Form of Agreement Between Owner and Architect for Architectural Interior Design Services
- B153-2007, Standard Form of Agreement Between Owner and Architect for Furniture, Furnishings and Equipment Design Services
- B161-2002, Standard Form of Agreement Between Client and Consultant for use where the Project is located outside the United States
- B162-2002, Abbreviated Form of Agreement Between Client and Consultant for use where the Project is located outside the United States
Please visit http://documentsondemand.aia.org.
Related Stories
| Aug 8, 2013
Top Science and Technology Sector Construction Firms [2013 Giants 300 Report]
Skanska, DPR, Suffolk top Building Design+Construction's 2013 ranking of the largest science and technology sector contractors and construction management firms in the U.S.
| Aug 8, 2013
Level of Development: Will a new standard bring clarity to BIM model detail?
The newly released LOD Specification document allows Building Teams to understand exactly what’s in the BIM model they’re being handed.
| Aug 8, 2013
Vertegy spins off to form independent green consultancy
St. Louis-based Vertegy has announced the formation of Vertegy, LLC, transitioning into an independent company separate from the Alberici Enterprise. The new company was officially unveiled Aug. 1, 2013
| Aug 5, 2013
Top Retail Architecture Firms [2013 Giants 300 Report]
Callison, Stantec, Gensler top Building Design+Construction's 2013 ranking of the largest retail architecture and architecture/engineering firms in the United States.
| Aug 5, 2013
Top Retail Engineering Firms [2013 Giants 300 Report]
Jacobs, AECOM, Henderson Engineers top Building Design+Construction's 2013 ranking of the largest retail engineering and engineering/architecture firms in the United States.
| Aug 5, 2013
Retail market shows signs of life [2013 Giants 300 Report]
Retail rentals and occupancy are finally on the rise after a long stretch in the doldrums.
| Aug 5, 2013
Top Retail Construction Firms [2013 Giants 300 Report]
Shawmut, Whiting-Turner, PCL top Building Design+Construction's 2013 ranking of the largest retail contractor and construction management firms in the United States.
| Aug 2, 2013
Michael Baker Corp. agrees to be acquired by Integrated Mission Solutions
Michael Baker Corporation (“Baker”) (NYSE MKT:BKR) announced today that it has entered into a definitive merger agreement to be acquired by Integrated Mission Solutions, LLC (“IMS”), an affiliate of DC Capital Partners, LLC (“DC Capital”).
| Jul 31, 2013
Hotel, retail sectors bright spots of sluggish nonresidential construction market
A disappointing recovery of the U.S. economy is limiting need for new nonresidential building activity, said AIA Chief Economist, Kermit Baker in the AIA's semi-annual Consensus Construction Forecast, released today. As a result, AIA reduced its projections for 2013 spending to 2.3%.
| Jul 30, 2013
Better planning and delivery sought for VA healthcare facilities
Making Veterans Administration healthcare projects “better planned, better delivered” is the new goal of the VA’s Office of Construction and Facilities Management.