The AIA announced that it has incorporated seven new documents into AIA Documents-on-Demand, bringing the total number of documents available through this service to 86.
The latest addition to Documents-on-Demand includes documents from the A series for Owner/Contractor and the B series for Owner/Architect. Overall, 41 total agreements and forms are now included in Documents-on-Demand that are specifically suited for contractors and three specifically for sub-contractors. AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.
"Documents-on-Demand is a streamlined portal that helps my company access the most important documents we need from AIA Contract Documents," said Shawn Brothers, Contractor at Cronin Construction, Inc. "And, the documents are incredibly easy to use once purchased and downloaded."
AIA Documents-on-Demand is a popular, cost effective, Web-based service that enables both PC and MAC users to easily access, electronically fill out, and print the latest AIA Contract Documents anytime and anywhere with access to the Internet and a printer. Last year, more than 35,000 documents were downloaded through Documents-on-Demand. "Since the relaunch of Documents-on-Demand in 2009, the service has proven incredibly popular and user-friendly as a result of its ease and flexibility," said Molly Lindblom, Managing Director of AIA Contract Documents. "Documents-on-Demand is continuously updated with the latest documents to help meet the changing needs of design and construction industry professionals."
The following documents have been added to AIA Documents-on-Demand:
- A151-2007, Standard Form of Agreement Between Owner and Vendor for Furniture, Furnishings and Equipment where the basis of payment is a Stipulated Sum
- A251-2007, General Conditions of the Contract for Furniture, Furnishings and Equipment
- A751-2007, Invitation and Instructions for Quotation for Furniture, Furnishings and Equipment
- B152-2007, Standard Form of Agreement Between Owner and Architect for Architectural Interior Design Services
- B153-2007, Standard Form of Agreement Between Owner and Architect for Furniture, Furnishings and Equipment Design Services
- B161-2002, Standard Form of Agreement Between Client and Consultant for use where the Project is located outside the United States
- B162-2002, Abbreviated Form of Agreement Between Client and Consultant for use where the Project is located outside the United States
Please visit http://documentsondemand.aia.org.
Related Stories
| Sep 23, 2014
Cedars-Sinai looks to streamline trauma care with first-of-its-kind OR360 simulation space
The breakthrough simulation center features moveable walls and a modular ceiling grid that allow doctors and military personnel to easily reconfigure the shape and size of the space.
| Sep 23, 2014
Third phase of New York’s High Line redevelopment opens
The $35 million Phase 3, known as High Line at the Rail Yards, broke ground September 20, 2012, and officially opened to the public on September 21.
| Sep 23, 2014
Cloud-shaped skyscraper complex wins Shenzhen Bay Super City design competition
Forget the cubist, clinical, glass and concrete jungle of today's financial districts. Shenzhen's new plan features a complex of cloud-shaped skyscrapers connected to one another with sloping bridges.
| Sep 23, 2014
Designing with Water: Report analyzes ways coastal cities can cope with flooding
The report contains 12 case studies of cities around the world that have applied advanced flood management techniques.
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
NCARB overhauls Intern Development Program, cuts years off licensure process
The newly adopted changes will be implemented in two phases. The first will streamline the program by focusing on the IDP’s core requirements and removing its elective requirements. The second phase will condense the 17 current experience areas into six practice-based categories.
| Sep 22, 2014
Biloxi’s new Maritime and Seafood Industry Museum is like a ship in a bottle
Nine years after the Museum of Maritime and Seafood Industry in Biloxi, Miss., was damaged by Hurricane Katrina’s 30-foot tidal surge, the museum reopened its doors in a brand new, H3-designed building.
| Sep 22, 2014
Swanke-designed Eurasia Tower opens in Moscow
The 72-story tower—the first mixed-use, steel tower in Russia—is located within the new, 30 million-sf, 148-acre Moscow International Business Center.
| Sep 22, 2014
USGBC names 2014 Best of Buildings Award winners
The Best of Building Awards celebrate the year’s best products, projects, organizations and individuals making an impact in green building.
| Sep 20, 2014
Healthcare conversion projects: 5 hard-earned lessons from our experts
Repurposing existing retail and office space is becoming an increasingly popular strategy for hospital systems to expand their reach from the mother ship. Our experts show how to avoid the common mistakes that can sabotage outpatient adaptive-reuse projects.