flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA introduces seven new contract documents to Documents-On-Demand service??

AIA introduces seven new contract documents to Documents-On-Demand service??

AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.


By By BD+C Staff | February 7, 2012
This article first appeared in the March 2012 issue of BD+C.

The AIA announced that it has incorporated seven new documents into AIA Documents-on-Demand, bringing the total number of documents available through this service to 86.

The latest addition to Documents-on-Demand includes documents from the A series for Owner/Contractor and the B series for Owner/Architect. Overall, 41 total agreements and forms are now included in Documents-on-Demand that are specifically suited for contractors and three specifically for sub-contractors. AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.

"Documents-on-Demand is a streamlined portal that helps my company access the most important documents we need from AIA Contract Documents," said Shawn Brothers, Contractor at Cronin Construction, Inc. "And, the documents are incredibly easy to use once purchased and downloaded."

AIA Documents-on-Demand is a popular, cost effective, Web-based service that enables both PC and MAC users to easily access, electronically fill out, and print the latest AIA Contract Documents anytime and anywhere with access to the Internet and a printer. Last year, more than 35,000 documents were downloaded through Documents-on-Demand. "Since the relaunch of Documents-on-Demand in 2009, the service has proven incredibly popular and user-friendly as a result of its ease and flexibility," said Molly Lindblom, Managing Director of AIA Contract Documents. "Documents-on-Demand is continuously updated with the latest documents to help meet the changing needs of design and construction industry professionals."

The following documents have been added to AIA Documents-on-Demand:

  1. A151-2007, Standard Form of Agreement Between Owner and Vendor for Furniture, Furnishings and Equipment where the basis of payment is a Stipulated Sum
  2. A251-2007, General Conditions of the Contract for Furniture, Furnishings and Equipment
  3. A751-2007, Invitation and Instructions for Quotation for Furniture, Furnishings and Equipment
  4. B152-2007, Standard Form of Agreement Between Owner and Architect for Architectural Interior Design Services
  5. B153-2007, Standard Form of Agreement Between Owner and Architect for Furniture, Furnishings and Equipment Design Services
  6. B161-2002, Standard Form of Agreement Between Client and Consultant for use where the Project is located outside the United States
  7. B162-2002, Abbreviated Form of Agreement Between Client and Consultant for use where the Project is located outside the United States 

Please visit http://documentsondemand.aia.org.

Related Stories

Giants 400 | Aug 4, 2015

GIANTS 300 REPORT: Top 64 Architecture/Engineering Firms

Stantec, HOK, and Callison RTKL top Building Design+Construction's 2015 ranking of the largest architecture/engineering firms in the United States. 

Giants 400 | Aug 4, 2015

GIANTS 300 REPORT: Top 106 Architecture Firms

Gensler, Perkins+Will, and Kohn Pedersen Fox top Building Design+Construction's 2015 ranking of the largest architecture firms in the United States. 

Giants 400 | Aug 4, 2015

ARCHITECTURE GIANTS: 21 practice management innovations from architecture Giants

Design firms have gone all out with management innovations in the last year. Check out which ones might work for your firm.

Architects | Aug 4, 2015

Frank Lloyd Wright School of Architecture closer to independent incorporation

The school is halfway to its first fundraising milestone, but is facing a major deadline at end of this month.

Industrial Facilities | Aug 3, 2015

Architect Jacques Rougerie envisions floating city to function as roving laboratory

The manta ray-shaped vessel will be completely self-sustaining, run on marine energy, and produce no waste. 

Cultural Facilities | Aug 3, 2015

Funding needed for Washington's Desert Storm memorial

 The National Desert Storm Memorial Foundation has a $25 million goal for the project.

Sports and Recreational Facilities | Jul 31, 2015

Zaha Hadid responds to Tokyo Olympic Stadium controversy

“Our warning was not heeded that selecting contractors too early in a heated construction market and without sufficient competition would lead to an overly high estimate of the cost of construction,” said Zaha Hadid in a statement.

Architects | Jul 30, 2015

The Lego Architect: Book offers simple how-to steps for recreating iconic buildings with Legos

The book features famous buildings accompanied with a photograph and drawing of the Lego model of the building, and a list of all the Lego pieces needed to complete a model of the building.  

Transit Facilities | Jul 30, 2015

Snøhetta designs ring-shaped cable car station in Italian Alps

In Snøhetta’s design, two cylindrical rings embedded into the existing topography, each at different elevations, will be connected by a cable car. During the minute-long cable car journey, passengers can enjoy views of the city and of the Italian Alps.

Office Buildings | Jul 29, 2015

Design plans for Fannie Mae’s new HQ revealed

The developer/owner, Carr Properties, envisions a 1-million-sf plus mixed-use center with a large retail pavilion.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021