flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA introduces five new documents for use on sustainable projects

AIA introduces five new documents for use on sustainable projects


By By BD+C Staff | October 11, 2011
The AIA Contract Documents program continues to revise existing documents and develop new documents and guides, as necessary, to

 

Five AIA Contract Documents are going green. Developed using AIA’s flagship documents as a base, and incorporating concepts and model language from the AIA’s Guide for Sustainable Projects, the new documents address the unique roles, risks and opportunities encountered on sustainable design and construction projects.

 “The development of these new documents for sustainable projects is a natural next step following the release of the Guide for Sustainable Projects in the spring,” said Ken Cobleigh, Managing Director and Counsel for AIA Contract Documents Content. “We continue to see a demand for incorporating sustainable elements in projects. The AIA Contract Documents program continues to revise existing documents and develop new documents and guides, as necessary, to remain current with trends and changes in the industry and law.”

The new AIA Contract Documents created for use on sustainable projects include:

  • A101-2007 SP, Standard Form of Agreement between Owner and Contractor, for use on a Sustainable Project where the basis of payment is a Stipulated Sum
  • B101-2007 SP, Standard Form of Agreement Between Owner and Architect, for use on a Sustainable Project
  • A201-2007 SP, General Conditions of the Contract for Construction, for use on a Sustainable Project
  • C401-2007 SP, Standard Form of Agreement Between Architect and Consultant, for use on a Sustainable Project
  • A401-2007 SP, Standard Form of Agreement Between Contractor and Subcontractor, for use on a Sustainable Project

AIA Document D503-2011, Guide for Sustainable Projects, including Agreement Amendments and Supplementary Conditions, was released by the AIA in May 2011. In the short time since it was released, over 4,000 users have downloaded the Guide. In addition to providing model language that may be used to amend or supplement AIA Contract Documents for design-bid-build projects, the Guide discusses the applicability of key concepts to other delivery models such as design-build, construction management and integrated project delivery.

 Because the AIA believes the Guide is an important resource for the design and construction industry, it is available as a free download at www.aia.org/sustainableprojectsguide.

These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand. To purchase these and other AIA Contract Documents, please go to http://www.aia.org/contractdocs/index.htm. BD+C

Related Stories

| Nov 2, 2011

Jacobs announces acquisition of KlingStubbins

Jacobs Engineering Group Inc. announced that it has acquired KlingStubbins. Officials did not disclose the terms of the agreement. Jacobs' acquisition of KlingStubbins, which has approximately 500 employees located in the United States and Asia, particularly enhances the Company's capabilities in design. KlingStubbins provides professional services in planning, architecture, engineering and interiors.

| Nov 1, 2011

Perkins Eastman opens office in San Francisco

Located at 23 Geary Street in the One Kearny building, the 8,100 sf office will accommodate a growing staff of 45.

| Nov 1, 2011

Sasaki expands national sports design studio

Sasaki has also added Stephen Sefton to the sports design studio as senior associate. 

| Nov 1, 2011

Holcim awards winners for North America announced

A socio-architectural project to create regional food-gathering nodes and a logistics network in Canada's high arctic territory won the top prize for North America of $100,000.

| Oct 27, 2011

iProspect selects VLK Architects for new office design

Company growth prompted iProspect to make the decision to move to a new space.

| Oct 27, 2011

ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration

Aperio will integrate with MAXXESS's eAXxess  and Efusion Event Management Software packages.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 26, 2011

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

New store features 1,200 sf fit out at Aventura Mall.

| Oct 25, 2011

HKS Science & Technology practice formed

Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021