flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA expands Documents-On-Demand service??

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.
 


By Posted by Tim Gregorski, Senior Editor | May 29, 2012

The AIA announced the inclusion of six new documents into its popular Documents-on-Demand service, which for nearly four years has offered PC, MAC and tablet users easy access to AIA Contract Documents’ cost effective contracts anytime and anywhere they have Internet access.

The latest additions, which bring the total number of documents available to 98, cover aspects of every common project delivery method the building industry uses to support construction and design projects.

The following documents have been added to AIA Documents-on-Demand:

  1. A141™–2004, Standard Form of Agreement Between Owner and Design-Builder
  2. ?2. A142™–2004, Standard Form of Agreement Between Design-Builder and Contractor ?
  3. 3. A441™–2008, Standard Form of Agreement Between Contractor and Subcontractor for a Design-Build Project?
  4. 4. B142™–2004, Standard Form of Agreement Between Owner and Consultant where the Owner contemplates using the design-build method of project delivery?
  5. 5. B143™–2004, Standard Form of Agreement Between Design-Builder and Architect ?
  6. 6. C441™–2008, Standard Form of Agreement Between Architect and Consultant for a Design-Build Project

Availability?AIA Documents-on-Demand is a free service. Users can purchase and download only the AIA Contract Document forms and agreements necessary for the project at hand with a price per document ranging from $6.95 to $21.95. Please visit: http://documentsondemand.aia.org.

More information about AIA Contract Documents can be found at www.aia.org/contractdocs. +

Related Stories

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category


K-12 Schools

Designing for dyslexia: How architecture can address neurodiversity in K-12 schools

Architects play a critical role in designing school environments that support students with learning differences, particularly dyslexia, by enhancing social and emotional competence and physical comfort. Effective design principles not only benefit students with dyslexia but also improve the learning experience for all students and faculty. This article explores how key design strategies at the campus, classroom, and individual levels can foster confidence, comfort, and resilience, thereby optimizing educational outcomes for students with dyslexia and other learning differences.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021