flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA expands Documents-On-Demand service??

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.
 


By Posted by Tim Gregorski, Senior Editor | May 29, 2012

The AIA announced the inclusion of six new documents into its popular Documents-on-Demand service, which for nearly four years has offered PC, MAC and tablet users easy access to AIA Contract Documents’ cost effective contracts anytime and anywhere they have Internet access.

The latest additions, which bring the total number of documents available to 98, cover aspects of every common project delivery method the building industry uses to support construction and design projects.

The following documents have been added to AIA Documents-on-Demand:

  1. A141™–2004, Standard Form of Agreement Between Owner and Design-Builder
  2. ?2. A142™–2004, Standard Form of Agreement Between Design-Builder and Contractor ?
  3. 3. A441™–2008, Standard Form of Agreement Between Contractor and Subcontractor for a Design-Build Project?
  4. 4. B142™–2004, Standard Form of Agreement Between Owner and Consultant where the Owner contemplates using the design-build method of project delivery?
  5. 5. B143™–2004, Standard Form of Agreement Between Design-Builder and Architect ?
  6. 6. C441™–2008, Standard Form of Agreement Between Architect and Consultant for a Design-Build Project

Availability?AIA Documents-on-Demand is a free service. Users can purchase and download only the AIA Contract Document forms and agreements necessary for the project at hand with a price per document ranging from $6.95 to $21.95. Please visit: http://documentsondemand.aia.org.

More information about AIA Contract Documents can be found at www.aia.org/contractdocs. +

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021