The AIA announced the inclusion of six new documents into its popular Documents-on-Demand service, which for nearly four years has offered PC, MAC and tablet users easy access to AIA Contract Documents’ cost effective contracts anytime and anywhere they have Internet access.
The latest additions, which bring the total number of documents available to 98, cover aspects of every common project delivery method the building industry uses to support construction and design projects.
The following documents have been added to AIA Documents-on-Demand:
- A141™–2004, Standard Form of Agreement Between Owner and Design-Builder
- ?2. A142™–2004, Standard Form of Agreement Between Design-Builder and Contractor ?
- 3. A441™–2008, Standard Form of Agreement Between Contractor and Subcontractor for a Design-Build Project?
- 4. B142™–2004, Standard Form of Agreement Between Owner and Consultant where the Owner contemplates using the design-build method of project delivery?
- 5. B143™–2004, Standard Form of Agreement Between Design-Builder and Architect ?
- 6. C441™–2008, Standard Form of Agreement Between Architect and Consultant for a Design-Build Project
Availability?AIA Documents-on-Demand is a free service. Users can purchase and download only the AIA Contract Document forms and agreements necessary for the project at hand with a price per document ranging from $6.95 to $21.95. Please visit: http://documentsondemand.aia.org.
More information about AIA Contract Documents can be found at www.aia.org/contractdocs. +
Related Stories
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.