The AIA announced the inclusion of six new documents into its popular Documents-on-Demand service, which for nearly four years has offered PC, MAC and tablet users easy access to AIA Contract Documents’ cost effective contracts anytime and anywhere they have Internet access.
The latest additions, which bring the total number of documents available to 98, cover aspects of every common project delivery method the building industry uses to support construction and design projects.
The following documents have been added to AIA Documents-on-Demand:
- A141™–2004, Standard Form of Agreement Between Owner and Design-Builder
- ?2. A142™–2004, Standard Form of Agreement Between Design-Builder and Contractor ?
- 3. A441™–2008, Standard Form of Agreement Between Contractor and Subcontractor for a Design-Build Project?
- 4. B142™–2004, Standard Form of Agreement Between Owner and Consultant where the Owner contemplates using the design-build method of project delivery?
- 5. B143™–2004, Standard Form of Agreement Between Design-Builder and Architect ?
- 6. C441™–2008, Standard Form of Agreement Between Architect and Consultant for a Design-Build Project
Availability?AIA Documents-on-Demand is a free service. Users can purchase and download only the AIA Contract Document forms and agreements necessary for the project at hand with a price per document ranging from $6.95 to $21.95. Please visit: http://documentsondemand.aia.org.
More information about AIA Contract Documents can be found at www.aia.org/contractdocs. +
Related Stories
| Dec 4, 2012
Greenhorne & O’Mara signs letter of intent to join Stantec
Acquisitions of C3TS and Architecture 2000 also completed.
| Dec 4, 2012
Sto Corp. announces new distributor in the Carolinas
Company will now have coverage in several parts of North Carolina.
| Dec 4, 2012
Wirtz Beverage Illinois’ corporate headquarters completed
WBI Center, a new state-of-the-art facility, is designed by Ware Malcomb.
| Dec 4, 2012
Wagner joins Ghafari as Manager of Structural Engineering
Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million.
| Dec 4, 2012
City of Gainesville to break ground on $33 million bus fleet maintenance and ops facility
The 140,000-sf facility will include dispatch, administrative and maintenance facilities.
| Nov 28, 2012
Project team to showcase design for first mixed-use retail center of its kind in Mexico City
Project reaching construction milestone, offering national model for urban development in Mexico.
| Nov 28, 2012
Cummins announces ratings classification for data center power systems
The Data Center Continuous ratings span the range of Cummins Power Generation’s high horsepower diesel generator sets, from 1 MW up to 2.5 MW, and will apply to both 50 Hz and 60 Hz configurations.
| Nov 28, 2012
Francis Cauffman appoints Stainbrook Director of Higher Education
Stainbrook has 16 years of experience as a strategic planner and urban designer working on complex projects on- and off-campus.
| Nov 27, 2012
SFIA releases technical guide for cold-formed steel framing products
The 114-page book covers both structural and non-structural applications, including section properties of SFIA member product profiles, and complete load and span tables for most applications.
| Nov 21, 2012
Architecture Billings Index positive for third straight month
All regions reporting positive business conditions