flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA Course: Historic Masonry — Restoration and Renovation

AIA Course: Historic Masonry — Restoration and Renovation

Earn 1.0 AIA learning unit by taking this free course


By By C.C. Sullivan and Barbara Horwitz-Bennett | August 11, 2010
This article first appeared in the 200908 issue of BD+C.


        
       
Summary

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Recognizing this, seasoned architects and consultants often spend much time analyzing and evaluating an existing structure with the goal of best preserving the original façade design. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

What you will learn
After reading this article, you should be able to:
* Discuss the basic issues affecting the restoration of historic brick structures.
* Describe the characteristics of natural stone and historic mortars that must be considered in renovation and restoration projects.
* Explain the basic details and installation techniques for proper application of manufactured cast stone.
* List three ways to prevent moisture-related defects in masonry and brick walls.
* Explain the benefits of stone and brick for sustainable building projects.

Take this free AIA course at:
http://www.bdcuniversity.com/historic-masonry-restoration-and-renovation?courseid=1742   (short registration required)
      
   

Related Stories

| Feb 6, 2012

Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation

Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 2, 2012

VLK Architects selected for new Cypress, Texas elementary school

The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.

| Feb 2, 2012

Mortenson Construction to build 2.4 MW solar project in North Carolina

Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Delk joins Gilbane Building Co.

Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

| Feb 1, 2012

Increase notched in construction jobs, but unemployment rate still at 16%

AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021