flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA contract document updates include new BIM, digital data provisions

Codes and Standards

AIA contract document updates include new BIM, digital data provisions

Documents are structurally different from 2007, 2008 versions.


By Peter Fabris, Contributing Editor | October 20, 2017
Blueprints
Blueprints

The AIA Documents Committee has revamped standard contract documents regarding Building Information Modeling (BIM) and other digital data.

The first standard forms for BIM were released a decade ago, and much has changed regarding BIM practices since then. The 2017 release updates digital practice documents including AIA Document E203–2013, Building Information Modeling and Digital Data Exhibit; AIA Document G201–2013, Project Digital Data Protocol Form; and AIA Document G202–2013, Project Building Information Modeling Protocol Form.

The updated documents are structurally different from their predecessors. They require all members of the building team to agree upon protocols for the transmission and use of instruments of service or other documentation in digital form. They also address the risks and responsibilities associated with sharing project information in digital format.

Members of the building team must spell out requirements for the various elements of the model at various stages of the project. These details should be well documented so that allowed uses of the model and how it is to be used are well understood by all parties.

Revised documents clarify that the contractor may maintain contract documents, change orders, construction change directives, and other modifications at the site in electronic format. The documents also now address the issue of notice in electronic format.

For more information on AIA contract documents, visit: https://www.aiacontracts.org/

Related Stories

Codes and Standards | May 8, 2018

Powerhouse coalition builds energy positive buildings

The goal: build buildings that provide more power than they cost to build, run, and demolish.

Codes and Standards | May 7, 2018

Plan advances in Los Angeles for Climate Emergency Mobilization Department

Would oversee efforts to reduce greenhouse gas emissions across the city.

Codes and Standards | May 3, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

Codes and Standards | May 1, 2018

ASHRAE publishes new energy simulation-aided design standard

Requires building energy modeling during schematic design.

Codes and Standards | Apr 30, 2018

CALGreen projects pre-approved for streamlined LEED v4 requirements

Reduces need to run additional energy models.

Codes and Standards | Apr 26, 2018

New standard supports community resilience

ASTM International guidance supports cost-effective ways to withstand and recover from disasters.

Codes and Standards | Apr 25, 2018

Lessons learned from decades of Superfund cleanups guide contaminated land reuse

Sites repurposed for residential, commercial use, and solar energy generation.

Codes and Standards | Apr 24, 2018

Vibrant downtown core the key for urban multifamily development

Nighttime activity makes the difference.

Codes and Standards | Apr 19, 2018

ILFI launches new Zero Carbon Certification

Offers greater flexibility around project fuel types and offsetting renewables.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021