The AIA’s Architectural Billings Index took a nearly three-point jump in August, climbing into positive territory for the first time in five months. The ABI hit 50.2, up from 48.7 in July. A score above 50 indicates an increase in architectural billings.
By region, the South showed greatest strength (52.2), followed by the West (51.2), the Northeast (45.5), and the Midwest (45.3).
Strong categories: multifamily residential (53.0), institutional (50.2), commercial/industrial (47.9), and mixed practice (46.8)
The so-called new projects index was at a relatively healthy 57.2, up from 56.3 the previous month. But AIA Chief Economist Kermit Baker, PhD, Hon. AIA, cautions that design activity is likely to alternate between modest growth and modest decline for the foreseeable future. “Until the economy is on firmer ground, there aren’t likely to be strong increases in design services,” he says. +
Related Stories
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.