flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA: Architecture firms reporting progress on achieving carbon reduction targets as part of the 2030 Commitment

Architects

AIA: Architecture firms reporting progress on achieving carbon reduction targets as part of the 2030 Commitment

The AIA 2030 2014 Progress Report highlights an increase in design projects, gross square footage, and net-zero energy projects.


By AIA | October 22, 2015
AIA: Architecture firms reporting progress on achieving carbon reduction targets

Georgia Tech's Carbon-Neutral Energy Solutions Laboratory. Photo courtesy HDR

The American Institute of Architects (AIA) has produced a report assessing the work of firms that are part of the AIA 2030 Commitment, a voluntary initiative to commit their practice to advancing the AIA’s goal of carbon-neutral buildings by the year 2030. 

The key findings from the AIA 2030 2014 Progress Report include:

  • 140 firms submitted reports – a 41% increase from 2013
  • 2.4 billion gross square feet (GSF) represented in this data – a 50% increase YoY
  • 4,354 projects have been accounted for in this report – a 78% increase
  • 413 design projects are meeting the 60% carbon reduction target – a 3% increase
  • 197 net-zero energy projects – a 270% increase
  • 22% average firm reduction in Lighting Power Density for interior projects – a increase of 3%
  • 34% average Predicted Energy Use Intensity reduction reported by firms – a decrease of 3%
  • 11% of total GSF meeting the current 60% carbon reduction target – an increase of 4%
  • 53% of total GSF using energy modeling to predict operational energy consumption – a 13% decrease

In order to make data reporting easier the AIA partnered with the Department of Energy to create the AIA 2030 Design Data Exchange (DDx), an online monitoring, reporting and research tool for architecture firms. See user feedback and access the tool here.

The AIA has also partnered with Architecture 2030 and AIA Seattle to launch an educational program aimed at providing AIA members and other design professionals with the high-performance building knowledge necessary to meet the 2030 Challenge targets.

Tags

Related Stories

| Feb 27, 2014

Bluebeam Software launches Revu 12 for better field-ready document management and project collaboration

The latest version of the company’s flagship solution better enables users in document-intensive industries to digitally collaborate on project documents and more easily connect the office to the field.

| Feb 27, 2014

PocketCake lunches CPU designed for virtual reality simulations

The company's Virtual Reality Simulation Converter Assembly is three times more powerful than the average high-performance computer and allows for up to eight people to experience a virtual reality simulation at the same time.

| Feb 26, 2014

Adaptive reuse project brings school into historic paper mill

The project features nontraditional classrooms for collaborative learning, an arts and music wing, and a technologically sophisticated global resource center.

| Feb 26, 2014

Use this app to streamline safety inspections

Using the iAuditor app, one of our Skanska teams developed electronic reports that make safety inspections more efficient, and that make it easier to address any issues emerging from them.

| Feb 26, 2014

Startup PocketCake aims to bring virtual reality simulations to the AEC masses

Founded in 2012, the development firm offers custom virtual reality simulations for the price of a typical architectural illustration.

| Feb 26, 2014

Billie Jean King National Tennis Center serving up three-phase expansion

The project includes the construction of two new stadiums and a retractable roof over the existing Arthur Ashe Stadium. 

| Feb 25, 2014

Are these really the 'world's most spectacular university buildings'? [slideshow]

Emporis lists its top 13 higher education buildings from around the world. Do you agree with the rankings?

| Feb 25, 2014

NYC's Hudson Spire would be nation's tallest tower if built

Design architect MJM + A has released an updated design scheme for the planned 1,800-foot-tall, superthin skyscraper. 

| Feb 24, 2014

White Paper: Using social media to build your business

This white paper from Benjamin Moore provides practical guidance for building and sustaining an effective online presence, with the ultimate goal of helping your painting business become more successful.

| Feb 24, 2014

First look: UC San Diego opens net-zero biological research lab

The facility is intended to be "the most sustainable laboratory in the world," and incorporates natural ventilation, passive cooling, high-efficiency plumbing, and sustainably harvested wood.  

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021