flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA and Architecture for Humanity select Disaster Response Grant recipients

AIA and Architecture for Humanity select Disaster Response Grant recipients

Awards help each group implement their locally driven preparedness project in the second half of the year.
 


By Posted by Tim Gregorski, Senior Editor | July 17, 2012

The AIA and Architecture for Humanity are pleased to announce the grant recipients for the 2012 Disaster Response Plan Grant. Awards totaling $10,000 will help each group implement their locally driven preparedness project in the second half of the year.
The Disaster Grant Program is part of the Disaster Resiliency and Recovery Program, which coordinates the organizations’ advocacy, education and training to help architects make effective contributions to communities preparing for, responding to and rebuilding after disaster.

The grant recipients are:

  • Architecture for Humanity D.C. Chapter Disaster Response Project
    The project aims to engage D.C. architects in preparing the District’s shelters, helping with post-disaster damage assessment, and allowing architects to serve as leaders in all the communities of our nation’s capital. It also aims to engage D.C. architects in documenting and learning lessons from past disasters.
  • Washington State Disaster Preparedness and Response (DPR)
    A new Intrastate Mutual Aid law in the state allows architects, engineers and code officials to receive training and integrate with emergency management, but many of the details are yet to be determined. The DPR will advocate, educate, and train these design professionals to help implement the new law and prepare communities for disaster.
  • NYC Safety Assessments Trainings
    In partnership with AIANY and the NYC Office of Emergency Management (OEM), Architecture for Humanity NY (AFHny) will develop a disaster response network and offer periodic trainings in the post-disaster Safety Assessment Program (SAP).
  • Disaster Assistance Coordination Network in Maryland
    AIA Baltimore, in partnership with the Architecture for Humanity Baltimore chapter, plans to establish an active Disaster Assistance Program for the state of Maryland. This group will liaise between the state emergency management agencies, AIA, and other emergency management professionals in the region to develop plans and programs to address disaster preparedness and recovery.
  • Illinois Architects’ Emergency Management/Disaster Response Workshop
    The workshop will have key leaders of the AIA and Architecture for Humanity work collaboratively to develop an industry-specific comprehensive statewide disaster response plan in an exercise environment working alongside emergency management officials. In addition, develop a post-workshop toolkit for the education of our members in the architect’s role in emergency management in Illinois.

More information will be available soon on the Disaster Resiliency and Recovery Program website, ArchitectsRebuild.org. +

Related Stories

Multifamily Housing | Jul 12, 2017

7 noteworthy multifamily projects: posh amenities, healthy living, plugged-in lifestyle

Zen meditation gardens, bocce courts, saltwater pools, and free drinks highlight the niceties at these new multifamily developments.

Accelerate Live! | Jul 6, 2017

Watch all 20 Accelerate Live! talks on demand

BD+C’s inaugural AEC innovation conference, Accelerate Live! (May 11, Chicago), featured talks on machine learning, AI, gaming in construction, maker culture, and health-generating buildings.

Healthcare Facilities | Jun 29, 2017

Uniting healthcare and community

Out of the many insights that night, everyone agreed that the healthcare industry is ripe for disruption and that communities contribute immensely to our health and wellness.

Architects | Jun 25, 2017

Stantec adds RNL Design to its stable, fortifying several of its business units

The engineering giant also names successor to CEO who will retire at the end of this year.

Building Team | Jun 22, 2017

Seven lessons learned on commissioning projects

Commissioning is where the rubber meets the road in terms of building design.

Sponsored | Building Team | Jun 20, 2017

Plan ahead when building in the west

Getting a project through plan review can be an unusually long process, anywhere from six months to two years.

Architects | Jun 19, 2017

Preparing to negotiate: Get your head in the game

Logical and well-planned steps to effective negotiation.

| Jun 13, 2017

Accelerate Live! talk: Is the road to the future the path of least resistance? Sasha Reed, Bluebeam (sponsored)

Bluebeam’s Sasha Reed discusses why AEC leaders should give their teams permission to responsibly break things and create ecosystems of people, process, and technology.

| Jun 13, 2017

Accelerate Live! talk: Incubating innovation through R&D and product development, Jonatan Schumacher, Thornton Tomasetti

Thornton Tomasetti’s Jonatan Schumacher presents the firm’s business model for developing, incubating, and delivering cutting-edge tools and solutions for the firm, and the greater AEC market.

| Jun 13, 2017

Accelerate Live! talk: The future of computational design, Ben Juckes, Yazdani Studio of CannonDesign

Yazdani’s Ben Juckes discusses the firm’s tech-centric culture, where scripting has become an every-project occurrence and each designer regularly works with computational tools as part of their basic toolset.

boombox1
boombox2
native1

More In Category



Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021