flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AEC professionals should push for net zero projects

Codes and Standards

AEC professionals should push for net zero projects

Educate and lead clients to more sustainable choices, says LEED fellow.


By Peter Fabris, Contributing Editor | January 25, 2019

Courtesy Pixabay

Architects, engineers, and construction professionals should move aggressively to encourage more clients to build to net zero, says Gunnar Hubbard, FAIA, LEED Fellow, in a column posted at Real Estate Weekly.

Dire warnings in the latest climate report by the United Nation’s Intergovernmental Panel on Climate Change require bold action in the built environment, Hubbard writes. “Not all clients are environmentally aware or proactive to the same degree,” he writes. “Regardless, we must do everything in our power to educate them, and should not wait for them to ask how their projects can be more sustainable.”

The AEC profession has the knowledge and the tools to achieve net zero, and in many cases the budget allows that standard to be reached, he writes. This can be done by making the investment and ROI clear, “and getting away from unreasonable paybacks of 3-5 years as a cap on improved performance.”

Thermally sound, climate-responsive architecture including taking into account sun path movement and wind direction, and defining levels of comfort for the building type are critical. That approach, combined with smarter system selection for ventilation and comfort that can be tuned for increased controllability and performance will help achieve the net zero goal.

Related Stories

Codes and Standards | Jan 3, 2020

Labor supply and capability of workers worry contractors

Three out of four firms plan to add workers in 2020.

Codes and Standards | Jan 3, 2020

Car-free streets could become common in major cities

New York and San Francisco establish thoroughfares dedicated to transit, pedestrians.

Codes and Standards | Jan 2, 2020

CRE professionals have increased interest in embodied carbon accounting, smart buildings

Survey also shows that interest in resiliency lags behind.

Codes and Standards | Jan 2, 2020

White paper focuses on Metal Composite Material labeling

Document part of effort to uphold industry standards for the product.

Codes and Standards | Dec 18, 2019

Hard Rock Hotel collapse in New Orleans puts spotlight on undocumented workers

Having helped rebuild the city after Hurricane Katrina, many under threat of deportation.

Codes and Standards | Dec 18, 2019

Maryland lawmakers take on blocked sidewalks during construction projects

Legislation clarifies developers’ responsibilities.

Codes and Standards | Dec 18, 2019

New York City passes legislation to prevent bird strikes on buildings

Requires bird-safe materials on first 75 feet of a structure.

Codes and Standards | Dec 16, 2019

New Buildings Institute seeks entries for Zero Buildings Database

Listing illustrates feasibility of ultra low-energy buildings.

Codes and Standards | Dec 13, 2019

USGBC launches new tool to prioritize sustainability strategies

Highlights building design features that can lead to better performance.

Codes and Standards | Dec 12, 2019

Coalition calls for consistent building data disclosure regulations in Canada

Major real estate firms are driving the effort.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021