flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AEC industry reported high levels of fraud, cyber breaches, and security incidents in 2017

Codes and Standards

AEC industry reported high levels of fraud, cyber breaches, and security incidents in 2017

83% experienced at least one fraud incident.


By Peter Fabris, Contributing Editor | February 28, 2018

Fraud, cyber attacks, and security risks continue to plague the construction, engineering and infrastructure sector at high levels, according to senior corporate executives surveyed worldwide for the 2017/18 Kroll Annual Global Fraud & Risk Report.

The survey by the risk solutions provider found that 83% of respondents experienced at least one fraud incident in 2017. Nearly all (93%) reported a cyber incident, and 67% reported some other kind of security incident.

Information theft, loss, or attack was the most prevalent type of fraud experienced in the sector, cited by 33% of respondents, up 15 percentage points from 2016. Regulatory or compliance breach was second on the list, reported by 30% of executives, almost twice the reported incidence in last year’s survey (18%).

Physical theft or loss of intellectual property (IP) was the most prevalent type of security incident, with 43% saying their organizations fell victim to these crimes. “There is a convergence between physical and digital threats, with issues arising from equipment with sensitive data being stolen or lost, for example, or employees with access to highly sensitive information accidentally or intentionally causing a breach,” said Jason Smolanoff, senior managing director and global cyber security practice leader for Kroll.

Related Stories

Codes and Standards | Mar 4, 2021

Biden administration overturns Trump’s federal building design mandate

Previous order promoted classical and “traditional” architecture above others.

Codes and Standards | Mar 3, 2021

Texas freeze raises questions about risks of electrifying buildings

Gas stoves helped residents cook, boil water when power went out.

Codes and Standards | Mar 2, 2021

New Seattle building code eliminates fossil fuels for most space and water heating

Also increases on-site solar photovoltaics, reduces envelope heat loss, air leakage, and interior lighting power allowances.

Codes and Standards | Feb 25, 2021

It’s not just lumber—roofing material prices are also on the rise

Lower demand for petroleum products means less asphalt production.

Codes and Standards | Feb 23, 2021

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.

Codes and Standards | Feb 22, 2021

Preservation of Affordable Housing develops climate resilience strategy

Includes backup power for resident and staff “area of refuge”.

Codes and Standards | Feb 18, 2021

Construction industry moves toward comprehensive U.S. BIM standard

NIBS hosts roundtable to create coordinated program to advance collaboration.

Codes and Standards | Feb 17, 2021

Construction on international sports venues is ripe for corruption

Poor planning, complex contracting, a lack of accountability and high levels of collusion to blame.

Codes and Standards | Feb 16, 2021

Feds may fund removal of some urban highways

Senate bill proposes pilot program to reknit communities.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021