flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AEC firms leverage custom scripts to bridge the ‘BIM language gap'

AEC firms leverage custom scripts to bridge the ‘BIM language gap'

Without a common language linking BIM/VDC software platforms, firms seek out interoperability solutions to assist with the data transfer between design tools.


By David Barista, Editor-in-Chief | November 5, 2014
Thornton Tomasettis computational modeling and R&D incubator, CORE Studio, has
Thornton Tomasettis computational modeling and R&D incubator, CORE Studio, has developed numerous digital tools since its found

As AEC firms dive deeper into BIM/VDC modeling and simulation workflows, the number of software tools put into play on a given project keeps growing exponentially. Firms recognize the value of implementing a mix of digital modeling tools, but the language barrier that exists between the different software platforms leads to tremendous waste and inefficiencies during the design and construction cycles. 

Without the free and rapid exchange of data from the earliest stages of design through construction, Building Teams are forced to perform double work, such as manually inputting data and rebuilding early conceptual design models in a BIM platform. They also miss out on the potential of iterative design, where, for example, the results from daylight and energy modeling simulations can be fed back to the design team so it can make more-informed design decisions. 

What is  inadequate interoperability costing Building Teams? The most recent research—a NIST study published a decade ago (http://tinyurl.com/NISTsoftwareReport)—put the cost burden to the construction industry at $15.8 billion annually.

“When you look at the cost burden from a project budget perspective, interoperability accounts for 2-3% of the total construction budget,” says Nathan Miller, Associate Partner with BIM consulting firm CASE. “Just making a dent in that small percentage can yield a ton of benefits downstream.” 

Firms are itching for interoperability solutions to establish data pipelines between software platforms and streamline workflows. This demand has led to growth in the emerging field of computational scripting, where firms develop (or commission third-party consultants like CASE to create) custom “hacks” that link digital tools and automate, accelerate, or eliminate wasteful processes. 

“There are huge advantages to leveraging computational scripting and the broader concept of being able to customize your applications,” says Miller. “As a core capability, you’re going to see a greater need and desire among AEC firms to develop this skill set in-house, or have access to consulting firms like CASE.”

BD+C profiles two recent computational scripting projects that are making waves across the broader industry: Thornton Tomasetti’s TTX platform and CASE’s Rhynamo application.

 

THORNTON TOMASETTI’S TTX PLATFORM LINKS SIX DESIGN PLATFORMS

When structural engineering giant Thornton Tomasetti launched its in-house computational modeling and R&D incubator, CORE Studio, in 2011, one of its first objectives was to solve the BIM/VDC software language gap. At a minimum, the firm’s staff uses six primary design and modeling tools, none of which speak the same language. Incompatibility was costing Thornton Tomasetti thousands of staff hours annually by requiring its engineering teams to manually transfer project data from one design tool to another. It also impeded the exchange of data between team members during the design and construction cycles.

In the past, the firm had employed and tested a range of tools to translate project data from one platform to another, including IFC models and a suite of custom translators developed in house. But none of the solutions provided the ability to update and sync project models across multiple software platforms in real time, nor did they allow past versions of a model to be retrieved for analysis. These translators essentially performed “whole hog” imports that would completely overwrite the previous version, according to Benjamin Howes, Architect and Computational Designer with Thornton Tomasetti. “For example, if a draftsperson had been tagging and adding annotations to a Revit model and the model needed to be updated via a translation, all of the tagging and element-specific annotations would need to be redone.”

The firm’s solution was to make its design workflow software-agnostic by moving all critical project data into a custom database called TTX. More than two years in the making, the TTX platform provides real-time read, write, and sync capabilities across six software tools: ETABS, Grasshopper for Rhino, RAM Structural System, Revit, SAP 2000, and Tekla. 

Using any one of these applications, Thornton Tomasetti’s engineers can “check out” the latest data on their project from TTX, work on the design and documentation, and then “check in” the updated version.  

 

 
CORE Studio’s most prominent project to date is the TTX platform, a custom database that serves as the central repository for all of Thornton Tomasetti’s project data. Using TTX, the firm’s engineers can work on project models in any one of six software tools. Shown above is a project model displayed in all six software platforms supported by TTX: 1) SAP 2000, 2) Revit, 3) Tekla, 4) ETABS, 5) Grasshopper for Rhino, and 6) RAM Structural Systems. Screen shots: courtesy Thornton Tomasetti

 

“We may have 20 people working on any given project,” says Jonatan Schumacher, Director of CORE Studio. “It’s very difficult to coordinate between all team members. TTX serves as the coordination piece. Someone who’s been working on one platform can essentially update the database, and then the next morning everyone can checkout the latest data from the database and work in their respective modeling platform.”

Since the beta release of TTX in July 2013, more than 100 of the firm’s projects have been moved to the database, and nearly 12,000 data check-outs/check-ins have been executed. The firm currently has 95 regular TTX users. It also employs two full-time staff members to maintain the database, track updates to the major software platforms, and create custom tools for TTX. 

“One tool we’re developing will allow us to easily compare two versions of the same database side by side,” says Robert K. Otani, PE, LEED AP, Principal with Thornton Tomasetti. “The first thing that any client wants to know is: What changes were made from the last issuance to this issuance? This tool will allow our teams to search for and highlight any change or series of changes, in real time. It’s going to be a huge time-saver.”

CORE Studio is also working on a Web-based dashboard for TTX that will allow clients and team members to view models remotely using any browser or device. “It’s essentially a lightweight version of a BIM model viewer, where users can spin around in the model, zoom in and out, and hover over elements to reveal the design attributes,” says Schumacher. 

For more on TTX, visit www.ThorntonTomasetti.com/blog/post/43-Announcing-TTX.

 

RHYNAMO CREATES DATA BRIDGE BETWEEN REVIT AND RHINO

What started out as a nights and weekends coding project for CASE’s Miller has turned into one of the BIM consulting firm’s more exciting endeavors. Aptly named Rhynamo, the custom application serves as a bridge, linking two heavily used 3D modeling platforms—Rhino/Grasshopper for conceptual modeling and Autodesk Revit for BIM modeling—utilizing the open-source Dynamo graphical programming interface as the go-between.  

Rhynamo offers AEC firms the ability to bypass the excruciatingly time-consuming process of rebuilding from scratch early conceptual Rhino models in the Revit platform.

With a few keystrokes, vital project data embedded in a Rhino model, such as geometries, coordinates, design parameters, and massing, cam be automatically imported into Dynamo, which can then be used “to build all sorts of systems on top of the BIM framework that Revit offers,” according to Miller.

“What Rhynamo does is provide a series of visual scripting nodes for Dynamo that allow a user to bring into Dynamo just about any geometric piece and different parts of data that are embedded inside a Rhino file,” says Miller. “That may involve translating geometry or using Rhynamo to coordinate parameters that might have been developed inside the Rhino environment—or simply providing an overall assist with that pipeline.”

 


In this YouTube video, CASE's Nathan Miller demonstrates the Rhynamo script.

 

Besides speed gains (which are difficult to measure, says Miller, since any time gained will likely be allotted for additional design work), Rhynamo offers Building Teams the opportunity for rapid iteration to occur throughout the design cycle. 

“Instead of having to stop design at a certain point because the project deadline is looming, this seamless connection between design and production software allows design teams to move decisions further downstream and adapt to the changing conditions of a project much quicker,” says Miller.

“Design never stops,” he says. “When construction documents hit there are always going to be decisions that need to be made and studies to be done. Rhynamo is attempting to make the process as defined and efficient as possible.”

In less than three months since CASE launched a private beta test of Rhynamo, more than 300 BIM power users have downloaded the code for review. In the coming months, the firm plans to release the program as a free, open-source product, which will allow other firms to customize the code for their operations.  

HDR and RTKL, two of CASE’s regular clients, are among the early adopters of Rhynamo. Others include a major retailer that used the tool to migrate its library of 2D drawings to Revit in order to automate the creation of 3D BIM elements.

“We were able to translate from 2D drawing to a coarse 3D Revit model in seconds,” says Miller. “Interoperability technologies allow us to leverage data in new ways across many platforms.”

For more on Rhynamo, visit: http://content.case-inc.com/rhynamo.

Related Stories

| Jan 7, 2011

Total construction to rise 5.1% in 2011

Total U.S. construction spending will increase 5.1% in 2011. The gain from the end of 2010 to the end of 2011 will be 10%. The biggest annual gain in 2011 will be 10% for new residential construction, far above the 2-3% gains in all other construction sectors.

| Jan 7, 2011

Mixed-Use on Steroids

Mixed-use development has been one of the few bright spots in real estate in the last few years. Successful mixed-use projects are almost always located in dense urban or suburban areas, usually close to public transportation. It’s a sign of the times that the residential component tends to be rental rather than for-sale.

| Jan 4, 2011

Product of the Week: Zinc cladding helps border crossing blend in with surroundings

Zinc panels provide natural-looking, durable cladding for an administrative building and toll canopies at the newly expanded Queenstown Plaza U.S.-Canada border crossing at the Niagara Gorge. Toronto’s Moriyama & Teshima Architects chose the zinc alloy panels for their ability to blend with the structures’ scenic surroundings, as well as for their low maintenance and sustainable qualities. The structures incorporate 14,000 sf of Rheinzink’s branded Angled Standing Seam and Reveal Panels in graphite gray.

| Jan 4, 2011

6 green building trends to watch in 2011

According to a report by New York-based JWT Intelligence, there are six key green building trends to watch in 2011, including: 3D printing, biomimicry, and more transparent and accurate green claims.

| Jan 4, 2011

LEED standards under fire in NYC

This year, for the first time, owners of 25,000 commercial properties in New York must report their buildings’ energy use to the city. However, LEED doesn’t measure energy use and costs, something a growing number of engineers, architects, and landlords insist must be done. Their concerns and a general blossoming of environmental awareness have spawned a host of rating systems that could test LEED’s dominance.  

| Jan 4, 2011

LEED 2012: 10 changes you should know about

The USGBC is beginning its review and planning for the next version of LEED—LEED 2012. The draft version of LEED 2012 is currently in the first of at least two public comment periods, and it’s important to take a look at proposed changes to see the direction USGBC is taking, the plans they have for LEED, and—most importantly—how they affect you.

| Jan 4, 2011

California buildings: now even more efficient

New buildings in California must now be more sustainable under the state’s Green Building Standards Code, which took effect with the new year. CALGreen, the first statewide green building code in the country, requires new buildings to be more energy efficient, use less water, and emit fewer pollutants, among many other requirements. And they have the potential to affect LEED ratings.

| Jan 4, 2011

New Years resolutions for architects, urban planners, and real estate developers

Roger K. Lewis, an architect and a professor emeritus of architecture at the University of Maryland, writes in the Washington Post about New Years resolutions he proposes for anyone involved in influencing buildings and cities. Among his proposals: recycle and reuse aging or obsolete buildings instead of demolishing them; amend or eliminate out-of-date, obstructive, and overly complex zoning ordinances; and make all city and suburban streets safe for cyclists and pedestrians.

| Jan 4, 2011

An official bargain, White House loses $79 million in property value

One of the most famous office buildings in the world—and the official the residence of the President of the United States—is now worth only $251.6 million. At the top of the housing boom, the 132-room complex was valued at $331.5 million (still sounds like a bargain), according to Zillow, the online real estate marketplace. That reflects a decline in property value of about 24%.

boombox1
boombox2
native1

More In Category


Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021