flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Advanced Energy Design Guide for K-12 Schools to achieve zero energy

Codes and Standards

Advanced Energy Design Guide for K-12 Schools to achieve zero energy

Publication is joint effort by ASHRAE, AIA, IES, and USGBC.


By Peter Fabris, Contributing Editor | January 29, 2018

A new publication is intended to help build K-12 schools with advanced levels of energy savings.

Advanced Energy Design Guide for K-12 School Buildings – Achieving Zero Energy, is a joint effort by ASHRAE, AIA, IES, and USGBC, with support and funding from the U.S. Department of Energy (DOE) through the National Renewable Energy Laboratory (NREL). It is the first in a series of guides that is tailored to the design and creation of zero energy buildings.

“The guide builds upon the popular 50% advanced energy design guide series with new and updated recommendations on energy efficiency,” says Paul Torcellini, project committee chair. “Additionally, it provides guidance for on-site renewable energy generation and establishes a set of energy performance goals for achieving zero energy. The goals are provided for all ASHRAE climate zones, in both site and source energy.” 

How-to tips provide guidance for specialty areas—building and site planning, envelope, daylighting, electric lighting, plug loads, kitchens and food service, water heating, HVAC, and renewable generation. The document provides guidance on how to connect zero energy and teaching and learning.

Related Stories

| Oct 6, 2011

RoofPoint: A new green standard for roofs

Structured much like other rating systems, RoofPoint, establishes green standards specifically for roofs.

| Oct 6, 2011

Roofers critical of new OSHA harness rules

Roofers say a new OSHA rule requiring all residential roofers to wear a safety harness makes workers less safe, and is causing lost business for those who comply with the rule.

| Oct 6, 2011

Florida county proposes saving on construction costs by trumping city regulations

This summer, Pinellas County, FL wanted to save money on an $81 million public safety complex in Largo by using the county’s own building regulations and permit fees, not the city’s more expensive fees.

| Sep 30, 2011

OSHA Releases New Nail Gun Safety Document

The Occupational Safety and Health Administration and the National Institute for Occupational Safety and Health have developed a new guidance document, Nail Gun Safety—A Guide for Construction Contractors.

| Sep 30, 2011

Cement Industry Advocates For Environmental Regulatory Relief

EPA regulations impacting the cement industry could force the closure of 18 of the nearly 100 US cement plants and cost 4,000 manufacturing jobs .

| Sep 30, 2011

IRS Releases New Rule On Reclassifying Independent Contractors

The Internal Revenue Service (IRS) has a new Voluntary Classification Settlement Program that allows an employer to reclassify independent contractors as employees if those workers previously were misclassified.  

| Sep 29, 2011

Illinois Grapples With Definition of ‘Clean’ Construction Debris

The Illinois Pollution Control Board holds hearings this week about construction debris rules proposed by the state Environmental Protection Agency. 

| Sep 15, 2011

Alabama Prepares First Statewide Residential Building Code

Following a series of devastating tornadoes that ripped through Alabama on April 27th, the state is preparing to implement the first statewide building code for residential structures.  

| Sep 15, 2011

New Label Established For Energy Efficient Doors in UK

The British Fenestration Ratings Council (BFRC) has established a labelling program for all types of domestic pedestrian doors. 

| Sep 15, 2011

EPA Releases New High-Rise Residential Energy Star Rating

The U.S. Environmental Protection Agency recently announced an Energy Star rating for multi-family high-rise buildings. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021