flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Adrian Smith + Gordon Gill-designed crystalline tower breaks ground in southwestern China

Adrian Smith + Gordon Gill-designed crystalline tower breaks ground in southwestern China

Fitted with an LED façade, the 468-meter Greenland Tower Chengdu will act as a light sculpture for the city of Chengdu.


By BD+C Staff | November 24, 2014
All renderings courtesy Adrian Smith + Gordon Gill Architecture
All renderings courtesy Adrian Smith + Gordon Gill Architecture

Construction is under way on the Greenland Tower Chengdu, a 468-meter-high crystalline skyscraper in Chengdu, China, designed by Adrian Smith + Gordon Gill Architecture. 

When built, it will be the tallest building in southwestern China, surpassing Chengdu's current tallest buildings by more than 200 meters.

The multi-faceted glass tower was inspired by “the unique ice mountain topography around Chengdu,” the firm said. Plans indicate that inset LED lighting on the edges of the faceted glass will give viewers the impression of a shimmering glacier. The tower will thereby act as a light sculpture for the city of Chengdu.

The project is set for completion in 2018. It is part of a larger complex comprised of the main tower, two smaller towers, and a six-story podium. Office, retail, and residential space will all be included in these buildings, according to Next Big Future.

"The architecture and structure marry perfectly," the firm said in a statement. "The design fully considers the structural requirements of supertall buildings in a high seismic zone, using a geometrical plan, a tapered form, and a high-performance damper bracing system to ensure the structure’s stability and efficiency."

 

Related Stories

| Jan 9, 2013

Panasonic and Bluebeam preview new architect app at CES 2013

Panasonic and Bluebeam Software collaborate to develop and introduce the 4K tablet and software to the design and construction industry.

| Jan 3, 2013

Answered prayers

A bold renovation enables a small church to expand its mission on a grand scale.

| Jan 3, 2013

Top BIM/VDC articles of 2011-2012

A compendium of BD+Cs top building information modeling and virtual design + construction articles from 2011-12.

| Jan 3, 2013

8 trends shaping today’s senior housing

The ranks of those age 65 and older are swelling by the thousands every day. Is there an opportunity for your firm in the seniors housing market?

| Jan 2, 2013

Trends Report: New facilities enhance the quality of campus life

Colleges and universities are building state-of-the-art student unions, dining halls, and other non-academic buildings to enrich the campus experience, boost enrollment, and stay competitive.

| Jan 2, 2013

M&A activity at U.S. AEC firms up slightly

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011.

| Jan 2, 2013

Global data center market to ‘slow’ to 14.3% this year

Total global investment in data centers is expected to slow down somewhat this year but still increase at a respectable 14.3%, according to DCD Intelligence.

| Jan 2, 2013

Construction jobs made gains in 2012, even with a slow Q4, says Gilbane report

The construction sector in the nine states with 50% of construction employment was up 169,000 jobs from February to September 2012, following a lost of 137,000 jobs from September 2011 to January 2012.

| Dec 21, 2012

ABI gains for fourth straight month

Positive business conditions for all building sectors.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021