Adobe unveiled new 3D printing capabilities in Adobe Photoshop Creative Cloud. By radically simplifying the 3D print process, Photoshop CC will become a go-to tool for anyone who wants to print a 3D model.
Available immediately as part of a major update to Adobe CC, the new 3D printing capabilities enable Creative Cloud members to easily and reliably build, refine, preview, prepare, and print 3D designs, setting the stage for explosive growth in the 3D printing market.
The new 3D printing capabilities also help creatives to design in 3D from scratch or refine an existing 3D model and produce beautiful, print-ready 3D models using familiar Photoshop tools.
Automated mesh repair and support structure generation ensure models will be produced reliably, while accurate previews allow creatives to submit print jobs with confidence.
“The new 3D print capabilities in Photoshop CC take the guess work out of printing 3D models for everyone,” said Winston Hendrickson, vice president products, Creative Media Solutions, Adobe. “Before today there was a gap between the content produced by 3D modeling tools and what 3D printers need in order to deliver high quality results. Now, by simply clicking ‘Print’ in Photoshop CC, creatives can bring 3D designs to the physical world.”
Photoshop CC Turbocharges Emerging 3D Print Ecosystem
With today’s release of Photoshop CC, designs can be printed to a locally connected 3D printer or via built-in access to popular online 3D print services. Photoshop CC supports the most popular desktop 3D printers, such as the MakerBot Replicator, and also supports the full range of high quality materials available on Shapeways—the 3D printing community and marketplace—including ceramics, metals, and full color sandstone. Additionally, Photoshop users can now directly upload their 3D models to the Sketchfab 3D publishing service, and embed them in their Behance profile using Sketchfab’s interactive 3D viewer.
For more, visit: www.adobe.com/products/photoshop.html
Related Stories
| Jan 16, 2012
Suffolk completes construction on progressive operating suite
5,700 square-foot operating suite to be test bed for next generation of imaged-guided operating techniques.
| Jan 15, 2012
Hollister Construction Services oversees interior office fit-out for Harding Loevner
The work includes constructing open space areas, new conference, trading and training rooms, along with multiple kitchenettes.
| Jan 15, 2012
Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.
The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.
| Jan 15, 2012
535 Madison Avenue achieves LEED Gold certification
Class-A commercial building meets sustainability requirements of LEED Program.
| Jan 12, 2012
CSHQA receives AIA Northwest & Pacific Region Merit Award for Idaho State Capitol restoration
After a century of service, use, and countless modifications which eroded the historical character of the building and grounds, the restoration brought the 200,000-sf building back to its former grandeur by restoring historical elements, preserving existing materials, and rehabilitating spaces for contemporary uses.
| Jan 12, 2012
Stellar earns construction industry's most prestigious safety award
Now widely accepted as the construction industry's standard measure of safety performance, the STEP awards were established in 1989 to evaluate and improve safety practices and recognize outstanding safety efforts.
| Jan 12, 2012
Building independence: New take on female power
Memoir explores historic engineering project, women's empowerment era.
| Jan 12, 2012
3M takes part in Better Buildings Challenge
As a partner in the challenge, 3M has committed to reduce energy use by 25% in 78 of its plants, encompassing nearly 38 million-sf of building space.
| Jan 11, 2012
DOE announces guide for 50% more energy efficient retail buildings
The 50% AEDG series provides a practical approach for designers and builders of retail stores, and other major commercial building types, to achieve 50% energy savings compared to the building energy code used in many parts of the nation.
| Jan 11, 2012
Mortenson starts construction of Rim Rock Wind Project
Renewable energy contractor to build 189-megawatt wind project in Sunburst, Mont.