Adobe unveiled new 3D printing capabilities in Adobe Photoshop Creative Cloud. By radically simplifying the 3D print process, Photoshop CC will become a go-to tool for anyone who wants to print a 3D model.
Available immediately as part of a major update to Adobe CC, the new 3D printing capabilities enable Creative Cloud members to easily and reliably build, refine, preview, prepare, and print 3D designs, setting the stage for explosive growth in the 3D printing market.
The new 3D printing capabilities also help creatives to design in 3D from scratch or refine an existing 3D model and produce beautiful, print-ready 3D models using familiar Photoshop tools.
Automated mesh repair and support structure generation ensure models will be produced reliably, while accurate previews allow creatives to submit print jobs with confidence.
“The new 3D print capabilities in Photoshop CC take the guess work out of printing 3D models for everyone,” said Winston Hendrickson, vice president products, Creative Media Solutions, Adobe. “Before today there was a gap between the content produced by 3D modeling tools and what 3D printers need in order to deliver high quality results. Now, by simply clicking ‘Print’ in Photoshop CC, creatives can bring 3D designs to the physical world.”
Photoshop CC Turbocharges Emerging 3D Print Ecosystem
With today’s release of Photoshop CC, designs can be printed to a locally connected 3D printer or via built-in access to popular online 3D print services. Photoshop CC supports the most popular desktop 3D printers, such as the MakerBot Replicator, and also supports the full range of high quality materials available on Shapeways—the 3D printing community and marketplace—including ceramics, metals, and full color sandstone. Additionally, Photoshop users can now directly upload their 3D models to the Sketchfab 3D publishing service, and embed them in their Behance profile using Sketchfab’s interactive 3D viewer.
For more, visit: www.adobe.com/products/photoshop.html
Related Stories
| May 14, 2014
New study shows employees aren't happier working in green buildings
People working in buildings certified under LEED’s green building standard appear no more satisfied with their workplace environments than those in conventional buildings, according to new research from the University of California, Berkeley, and the University of Nottingham.
| May 14, 2014
Construction growth looking up: Gilbane Spring 2014 Economic Report
Construction spending for 2014 should finish 6.6% higher than in 2013, with nonresidential work contributing substantially.
| May 14, 2014
Prefab payback: Mortenson quantifies cost and schedule savings from prefabrication techniques
Value-based cost-benefit analysis of prefab approaches on the firm's 360-bed Exempla Saint Joseph Heritage Project shows significant savings for the Building Team.
| May 13, 2014
First look: Nadel's $1.5 billion Dalian, China, Sports Center
In addition to five major sports venues, the Dalian Sports Center includes a 30-story, 440-room, 5-star Kempinski full-service hotel and conference center and a 40,500-square-meter athletes’ training facility and office building.
| May 13, 2014
Drexel University case study report: Green Globes cheaper, faster than LEED
GBI’s Green Globes certification process is significantly less expensive to conduct and faster to complete than LEED certification, says Drexel prof.
| May 13, 2014
Steven Holl's sculptural Institute for Contemporary Art set to break ground at VCU
The facility will have two entrances—one facing the city of Richmond, Va., the other toward VCU's campus—to serve as a connection between "town and gown."
| May 13, 2014
Universities embrace creative finance strategies
After Moody’s and other credit ratings agencies tightened their standards a few years ago, universities had to become much more disciplined about their financing mechanisms.
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 13, 2014
Libeskind wins competition to design Canadian National Holocaust Monument
A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto. The monument is set to open in the autumn of 2015.
| May 12, 2014
Defining BIM – What do owners really want?
Given the complexities of the building process, it can be difficult for building owners to effectively communicate what they want and need with BIM. The response to the question usually is, “Give me everything.”