The Emil ‘Lucky’ Reznik Administration, Maintenance & Operations Facility has been certified LEED Platinum for New Construction by the USGBC.
RNL, in association with Forum Architects of South Bend, Indiana, and Maintenance Design Group, designed the Reznik Facility for the South Bend Public Transportation Corp.
The facility achieved 52 LEED points, including those for site selection, energy, materials and resources and innovation. At 164,200 sf, the facility is designed to embody the natural connection between sustainability and public transportation.
To compliment the many sustainable features in the Reznik Facility and to promote facility and community education, a digital display inside the lobby provides up-to-date information about the amount of energy the building is creating from its 92 kW photovoltaic roof panels. The system also tracks the amount of potable water saved from water-reducing lavatory fixtures and the facility’s recycled-water bus wash system, as well as the amount of storm water that has been detained on site. BD+C
Related Stories
| Dec 2, 2011
Goody Clancy awarded Ohio State residential project
The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.
| Dec 1, 2011
Nauset Construction breaks ground on Massachusetts health care center
The $20 million project is scheduled to be completed by December 2012.
| Dec 1, 2011
Ground broken on first LEED Platinum designed school house built by volunteers
Phoenix public school receives the generous gift of a state-of-the-art building for student and community use.
| Dec 1, 2011
VLK Architects’ office receives LEED certification
The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.
| Nov 29, 2011
First EPD awarded to exterior roof and wall products manufacturer
EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact.
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 29, 2011
Report finds credit crunch accounts for 20% of nation’s stalled projects
Persistent financing crunch continues to plague design and construction sector.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.
| Nov 29, 2011
Turner Construction establishes partnership with Clark Builders
Partnership advances growth in the Canadian marketplace.
| Nov 29, 2011
AIA launches stalled projects database
To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.