flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Adjaye Associates, SHoP, and Snohetta selected as three finalists to design the National Veterans Resource Complex

Education Facilities

Adjaye Associates, SHoP, and Snohetta selected as three finalists to design the National Veterans Resource Complex

Representatives of the firms will travel to Syracuse University to plan the next steps of their design processes


By Syracuse University | January 26, 2016

(Pictured) The Hall of Languages on Syracuse University's Campus . The NVRC building is planned for the western portion of the campus' Waverly block.  Photo Credit: David A. Sonnenfeld, Wikimedia Commons

Syracuse University is one step closer to selecting a world-class partner to conceptualize, design, and construct the new National Veterans Resource Complex (NVRC). The NVRC Selection Committee, made up of faculty, staff, students, and design professionals, recently reviewed the qualifications of 28 of the world’s foremost architecture firms. After careful consideration, the Selection Committee has selected three finalists to advance to the final round of the competition. The finalists are: Adjaye Associates; SHoP; and Snohetta. Notably, each of these firms is among the seven finalists currently vying for the opportunity to design the Obama Presidential Library in Chicago.

Directing the design competition on behalf of Syracuse University is Martha Thorne, dean of the IE School of Architecture and Design in Madrid. Thorne also serves as the executive director of the Pritzker Prize—the architecture award equivalent to the Nobel Prize.

“The three finalist firms and their teams are outstanding,” says Thorne. “I have no doubt they will propose ideas that go beyond traditional academic buildings and make the NVRC a pioneering facility that will contribute to the University, as well as the broader community.”

A first-of-its-kind, multi-use facility, the NVRC will serve as the enduring home of the University’s Institute for Veterans and Military Families (IVMF), which has served more than 48,000 veterans and military families. The NVRC will offer state-of-the-art vocational and educational programs designed to advance the economic success of the region’s and the nation’s veterans and military families. The structure itself will include classroom spaces to accommodate local and national veteran-focused programming, along with a conference center and roughly 1,000-seat auditorium suitable to host community activities, lectures, and national convening events and conferences. The facility is also expected to include gallery space exhibiting the University’s storied legacy of serving America’s veterans. Designed as a LEED-certified facility and constructed in accordance with Universal Design practices, the NVRC will be an inclusive facility that welcomes and accommodates veterans and visitors with disabilities.

As part of the design competition process, the selected firms will collaborate with the School of Architecture to present lectures – about their firms and their past work – to the campus community. These lectures are tentatively scheduled to take place in March, and will be open to the general public.

The firms will return to campus in April to present their final proposals to the Selection Committee. The winning firm will be announced in May.

Related Stories

Education Facilities | Jan 2, 2018

New Bancroft Campus responds to the challenges of autism through design

The 80-acre campus is located in Mount Laurel, N.J.

K-12 Schools | Nov 16, 2017

Future-proofing higher education: Understanding generation Z

There are three driving issues behind this next generation: demographic change, behavioral change, and the power to choose.

Reconstruction Awards | Nov 13, 2017

Harlem Renaissance: A vacant school provides much-needed housing and a clubhouse for children

Word that PS 186 might be demolished brought out the preservationists, whose letter-writing campaign gained the support of the New York Landmarks Conservancy.

Education Facilities | Oct 3, 2017

The growing demand for early childhood education

When the design of early learning centers is grounded in the science of developmental psychology and education, these educational environments can address multiple domains of development that positively stimulate young children's physical and cognitive growth.

Laboratories | Sep 12, 2017

New York City is positioning itself as a life sciences hub

A new Transwestern report highlights favorable market and regulatory changes.

Education Facilities | Aug 3, 2017

School of Communication and Media at Montclair State University merges faculty, professionals, and academic programs

CannonDesign designed the facility, which features a 197-seat presentation hall and various control rooms.

Government Buildings | Jul 26, 2017

Spector Group unveils new law enforcement center for Nassau County

The center will serve as a regional training center for all Nassau County Police personnel.

Education Facilities | Jul 14, 2017

Youth education center in Baltimore gets first students

Students learn environmental skills, natural resource management, urban agriculture, and water quality monitoring.

Cladding and Facade Systems | Jul 14, 2017

Angular observatory uses zinc panels to gain unobstructed view of night sky

The observatory’s pattern of lock-seamed zinc cladding alternates between the irregular site topography and the building’s geometry. 

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021