September 12, 2012 – Acentech Inc., multidisciplinary acoustics, audiovisual systems design, and vibration consulting firm, named Perry J. Artese to the firms’s Trevose, Penn. office as a senior consultant in the audiovisual systems design group.
Building on the firm’s audiovisual systems design expertise, Acentech is excited to apply Artese’s broad experience to projects in the mid-Atlantic region. Artese has many years of experience designing, specifying, and commissioning audiovisual systems for higher education, government, non-profits, and corporate/commercial facilities. His design work, coupled with his practical experience in the field, makes him qualified to envision projects from conception to completion. His years of experience have afforded Mr. Artese many opportunities to design a wide variety of current audiovisual technologies, including display, video, and audio conferencing, control, audio/video transport, lecture capture systems, and digital signage systems in signature facilities such as the FAA Headquarters and Temple University’s Fox School of Business.
As a senior consultant at Acentech, Artese focuses on advising, overseeing, and maintaining the client’s vision for the project from the initial kick-off meeting to the final commissioning of the completed systems. Artese is currently working on projects for Westminster Choir College New Academic Building, Temple University, The Shipley School, and Louis Brown Rutgers Athletic Center Expansion Project. +
Related Stories
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.