flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ABI turns positive after four monthly declines

ABI turns positive after four monthly declines


By By BD+C Staff | September 23, 2011
On the heels of a period of weakness in design activity, the Architecture Billings Index (ABI) took a sudden upturn in August.

 

On the heels of a period of weakness in design activity, the Architecture Billings Index (ABI) took a sudden upturn in August. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending.
 
The American Institute of Architects (AIA) reported the August ABI score was 51.4, following a very weak score of 45.1 in July. This score reflects an increase in demand for design services (any score above 50 indicates an increase in billings). The new projects inquiry index was 56.9, up sharply from a reading of 53.7 the previous month.
 
"Based on the poor economic conditions over the last several months, this turnaround in demand for design services is a surprise," said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. "Many firms are still struggling, and continue to report that clients are having difficulty getting financing for viable projects, but it's possible we've reached the bottom of the down cycle."
Key August ABI highlights:
  • Regional averages: Midwest (49.0), South (47.4), West (47.4), Northeast (46.5)
  • Sector index breakdown: mixed practice (50.9), institutional (48.5), commercial / industrial (46.0),  multi-family residential (44.8)
  • Project inquiries index: 56.9 BD+C 

Related Stories

| May 14, 2012

Plumbing research coalition to study drainline transport issue

The effort is aimed at determining if decreasing levels of water flow­­––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 14, 2012

SMPS and Deltek announce alliance

A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.

| May 14, 2012

ArchiCAD e-Specs integration unveiled

Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

| May 11, 2012

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

What historic preservationists and energy-performance advocates can learn from each other.

| May 11, 2012

VFA to acquire Altus Group's Capital Planning division

Strategic move strengthens VFA's facilities capital planning market osition in North America.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021