flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ABC: September's nonresidential spending slip no cause for concern

Contractors

ABC: September's nonresidential spending slip no cause for concern

Despite the monthly drop, September's year-over-year increase is largest in seven years. Seven of 16 nonresidential construction sectors saw spending increases.


By ABC | November 2, 2015
ABC: September's nonresidential spending slip no cause for concern

Roadway under construction near Medina, Wash. Highway and street-related construction spending increased 0.3% in September. Photo: Washington State Dept of Transportation/Creative Commons

Nonresidential construction spending fell in September for the first time in eight months, the U.S. Census Bureau reported, but the monthly drop in spending is not a cause for concern according to analysis by Associated Builders and Contractors (ABC). Nonresidential construction spending fell by 0.1% from August, totaling $692.8 billion on a seasonally adjusted annualized basis.

September's year-over-year increase of 12.4% is the largest increase since April 2008. After falling in two consecutive months, public nonresidential construction spending grew by 0.7% in September while private sector construction spending fell by 0.7% for the month.

"The last several months have generally been associated with sizable increases in nonresidential construction," said ABC Chief Economist Anirban Basu. "Today's release, while not particularly upbeat, does not alter the fact that nonresidential construction spending continues to recover and that most contractors are busier than they were a year ago.

"Although there are many potential forces at work that resulted September's monthly construction spending decline, most are not alarming. With construction materials prices falling, contractors may be able to offer somewhat lower prices for their services, helping to suppress growth in construction value put in place. It is also conceivable that some construction work is being slowed by an ongoing lack of available skilled personnel. This factor has certainly helped to slow residential construction, and it seems reasonable to presume that some nonresidential contractors would face similar issues.

 

 

Seven nonresidential construction sectors experienced spending increases in September on a monthly basis:

  • Educational-related spending expanded by 2% for the month and 11.5% for the year.
  • Spending in the religious category grew by 5.6% on a monthly basis and 0.8% year-over-year.
  • Amusement and transportation-related spending rose by 0.2% from August and 30.6% from September of last year.
  • Transportation-related spending expanded by 1.6% from a month ago and 10.2% from a year ago.
  • Highway and street-related construction spending inched 0.3% higher for the month and is up 10% from the same time last year.
  • Sewage and waste disposal-related spending rose by 1.1% from August and 12.9% from September of last year.
  • Spending in the water supply category gained 4.3% from the previous month and 5.6% on a year-ago basis.

Spending in nine nonresidential construction subsectors fell in September on a monthly basis:

  • Spending in the lodging category fell by 0.7% for the month but is up 32.8% from September 2014.
  • Office-related spending dipped 0.4% from August but is 19.3% higher than at the same time last year.
  • Spending in the commercial category fell by 1.1% on a monthly basis and by 2% on a yearly basis.
  • Health care-related spending inched 0.1% lower for the month but is up 9% on a year-ago basis.
  • Public safety-related spending fell 3% month-over-month and 4.8% year-over-year.
  • Spending in the communication-category declined 2.7% from August but is up 10.2% from the same time last year.
  • Power-related construction spending fell 1.7% on a monthly basis but expanded 1.9% over the previous twelve months.
  • Conservation and development-related spending lost 6% for the month but is still 1.6% higher than at the same time last year.
  • Manufacturing related spending fell 0.4% for the month but is still up 41.3% from September 2014.

To view the previous spending report, click here.

Related Stories

| May 14, 2012

Codes harvest rainwater

IAPMO’s Green Plumbing and Mechanical Code Supplement could make rainwater harvesting systems commonplace by clearly outlining safe installation and maintenance practices.

| May 14, 2012

Plumbing research coalition to study drainline transport issue

The effort is aimed at determining if decreasing levels of water flow­­––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 14, 2012

SMPS and Deltek announce alliance

A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.

| May 14, 2012

ArchiCAD e-Specs integration unveiled

Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

| May 11, 2012

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

What historic preservationists and energy-performance advocates can learn from each other.

boombox1
boombox2
native1

More In Category



Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021